Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • Oregon guideOregon Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Oregon
  4. ›Construction
  5. ›Portland International Airport Passenger Boarding Bridges…

Port of Portland·Oregon

Portland International Airport Passenger Boarding Bridges Floor Replacement

Closes 11/18/2026$1M – $2.5MInvitation for Bid
Get bids like this by emailBid source

Description

The Port of Portland is soliciting bids to replace the flooring in passenger boarding bridges (PBBs) at multiple gates and a fixed walkway at Portland International Airport. The work includes demolition of existing carpet and sub‑floor, installation of marine‑grade plywood sub‑floor, and placement of high‑spec indoor/outdoor carpet with low‑VOC adhesives. The contract is a lump‑sum award with a 10 % bid bond, performance and labor‑material bonds, and a 45‑day substantial‑completion schedule followed by a 90‑day final‑acceptance period. • Demolition, removal, and disposal of existing floor systems in airport‑restricted areas. • Supply and install marine‑grade, fire‑rated plywood sub‑floor and broadloom low‑VOC carpet per detailed specifications. • Compliance with strict airport security badge requirements, OSHA, EPA, TSA/FAA regulations, and Port‑specific safety and environmental plans. • Required documentation includes CPM schedule, monthly progress reports, product data, VOC certifications, warranties, and as‑built/red‑line drawings.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Brandon Alius

[email protected]

Key dates

Opened
10/28/2026
Questions due
11/9/2026
Pre-bid meeting
11/5/2026
Closes
11/18/2026
Duration
135 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
238320
Solicitation №
2026-14774

Budget estimate

$1,000,000 – $2,500,000

The solicitation does not disclose the contract value; however, replacing flooring across multiple passenger boarding bridges at a major airport typically ranges from $1 million to $2.5 million, depending on square footage, material grades, and labor rates. The estimate accounts for marine‑grade plywood, high‑quality low‑VOC carpet, demolition waste disposal, bond requirements, and a fast‑track schedule.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Port of Portland·Oregon

Top match · 87%

Portland International Airport North Runway Rehabilitation

Closes 11/12/2026Opened 10/15/2026

Port of Portland·Oregon

85% match

Portland International Airport Terminal Upper Roadway Joint Replacement

Closes 11/10/2026Opened 10/7/2026

Port of Portland·Oregon

85% match

Portland International Airport Taxiway K West Gates E3 to E6 and Vehicle Service Road Rehabilitation

Closes 11/4/2026Opened 10/8/2026

City of Melbourne Airport Authority·Florida

84% match

Carpet Replacement

Closes 11/5/2026Opened 9/29/2026

Texarkana Regional Airport·Arkansas

80% match

Texarkana Regional Airport – Restore and Reseal Exterior Wood Surfaces

Rolling / TBD closeOpened 9/20/2026

Raleigh Durham Airport Authority·North Carolina

80% match

Runway 5R-23L and T1 Apron Pavement Rehabilitation

Closes 11/9/2026Opened 9/30/2026

Port of Portland·Oregon

80% match

2026 ADVERTISING PROGRAM CONCESSION SOLICITATION AT PORTLAND INTERNATIONAL AIRPORT

Closes 11/24/2026Opened 10/9/2026

City of Boise·Idaho

80% match

2027 Airport Way & Elevated Roadway Construction

Closes 11/12/2026Opened 9/30/2026

City of Long Beach·California

80% match

Rubber & Paint Removal on Airfield Pavements

Closes 11/10/2026Opened 10/6/2026

Little Rock Municipal Airport Commission·Arkansas

80% match

4R-22L RUNWAY AND TAXIWAY LIGHTING REHABILITATION

Closes 11/18/2026Opened 10/11/2026

U.S. Department Of Homeland Security·Alaska

80% match

UNITED STATES COAST GUARD KETCHIKAN ALASKA NEW CARPET INSTALLATION

Closes 10/30/2026Opened 9/25/2026

Virgin Islands Port Authority·U.S. Virgin Islands

80% match

STX)-2027-01 (Parking Lot Resurfacing Project- Henry E Rohlsen Airport, ST. Thomas

Closes 12/2/2026Opened 10/22/2026

City of Charlotte·North Carolina

79% match

PCC Slab Replacement Program

Rolling / TBD closeOpened 8/3/2026

U.S. Department Of Homeland Security·Alaska

79% match

UNITED STATES COAST GUARD KETCHIKAN ALASKA NEW CARPET INSTALLATION

Closes 11/13/2026Opened 10/6/2026

City of Lynchburg·Virginia

79% match

TSA EXIT LANE TERMINAL EXPANSION

Closes 12/9/2026Opened 10/28/2026

New York City Department of Education·New York

79% match

Bid Extension: REQUIREMENTS CONTRACT FOR THE REPAIR AND REPLACEMENT OF WOOD FLOORS

Rolling / TBD closeOpened 5/25/2023

U.S. Department Of Defense·United States of America

79% match

Replace, Chemical-resistant Flooring in Laundry

Closes 11/17/2026Opened 10/28/2026

Jacksonville Port Authority·Florida

79% match

TALLEYRAND MARINE TERMINAL (TMT) PILE, CAP, AND BEAM REHAB

Closes 11/3/2026Opened 10/1/2026

City of Bangor·Maine

79% match

P27-36 Curb Replacement BGR

Closes 11/18/2026Opened 10/23/2026

Town of Westwood·Massachusetts

79% match

On Call Flooring

Rolling / TBD closeOpened 3/24/2026

City of Boise·Idaho

79% match

Boise Airport Vertical Transportation Equipment

Closes 11/4/2026Opened 10/7/2026

City of Chicago·Illinois

79% match

Airside and Landside Concrete and Maintenance for O’ Hare and Midway International Airports

Closes 11/18/2026Opened 10/13/2026

State of Hawaii Department of Transportation, Airports·Hawaii

78% match

CO1549-33 LOBBIES 4 AND 5 IMPROVEMENTS

Closes 11/19/2026Opened 9/24/2026

City and County of San Francisco·California

78% match

EXT AIR | As-Needed Airport Conveyance Maintenance

Closes 6/30/2029Opened 4/25/2024