Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • Florida guideFlorida Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Florida
  4. ›Construction
  5. ›International Gardens Park - Walkway Repairs Rebid

Miami-Dade County·Florida

International Gardens Park - Walkway Repairs Rebid

Closes 11/6/2026
Get bids like this by emailBid source

Description

1. Scope of Work – Furnish all labor, equipment and materials required to repair the asphalt walkways and various concrete pads throughout International Gardens Park located at 1898 SW 123 Court, Miami, FL 33175. The work includes mill and resurface approximately 3,400 SF of asphalt walkway, demo and remove approximately 8,200 SF of asphalt walkway, install approximately 7,100 SF of lime rock base, install approximately 7,100 SF of asphalt overlay, seal coat approximately 5,900 SF of asphalt walkway, and demo & install approximately 80 SF of concrete walkway/pads. See below for more details: a. Attachment 1 – Location shows the general location of International Gardens Park. Prior to submitting a bid, the contractor is to visit the work site and become familiar with the work. The site is in a county park and can be visited by the contractor at any time during open park hours. b. Attachment 2 – Sketches Location divides the park into 3 sections and shows the locations of Sketch A (south side of the park), Sketch B (northwest side of the park), and Sketch C (northeast side of the park). c. Attachment 3 – Sketch A, Attachment 4 – Sketch B, and Attachment 5 – Sketch C shows the scope of work for each of the three sections. d. The contractor is required to perform their own site take-off (field measurement) to complete all work. Any dimensions or quantities depicted in this RPQ are approximate and are not to be used for bid purposes. The existing asphalt walkway has at least two asphalt overlays in the past, so the existing depth of the asphalt walkway is somewhere 2 – 4 inches thick. e. The contractor shall abide by the PWD Manual 2 Specifications for asphaltic seal coat, asphalt cement concrete, and Portland cement concrete. Attached are the following: i. PWD Manual Part 1A ii. PWD Manual Part 1B iii. PWD Manual Part 2A iv. PWD Manual Part 2B f. Sketches A, B and C depict the locations of the following work descriptions: i. M&R (Milling and Resurfacing) – The contractor shall mill 1 to 1 ½ inches of asphalt from the existing walkway for the approximate dimensions (length and width in feet) as depicted on the sketch. At a minimum, the contractor shall mill through the top existing asphalt layer down into the second asphalt layer. The contractor shall remove all spoils from the site and properly dispose of the material. The contractor shall power sweep all milled areas prior to tack coat. The tack coat shall be heated and applied in a thin uniform layer at a rate of 0.03 and 0.15 gallons per square yard. The asphalt resurfacing layer may vary in thickness between 1 to 1 ½ inches and shall be Type S-1. All intersecting walkways shall have radius transitions. ii. Replace Asphalt Walkway (Demo Asphalt; Install Lime Rock Base; and Install Asphalt Overlay) – The Contractor shall saw cut the asphalt walkway full width at the beginning and end of the removal area. All of the asphalt spoils shall be removed from the site, the contractor shall also root prune and remove the roots and any other debris from the site. Contractor shall properly dispose of the material. The contractor shall compact the subgrade and install clean lime rock from a quarry (compacted well) to an elevation that allows for the finish asphalt surface to be flush with the adjacent existing asphalt surface. There are at least two asphaltic overlays making up the existing walkway surface in this park. Once the compacted lime rock base is at the proper elevation, the contractor shall apply the prime coat and install the asphaltic overlay. The prime coat shall be heated and applied in a thin uniform layer at a rate of no less than 0.10 gallons per square yard. The asphalt resurfacing layer may vary in thickness between 1 to 1 ½ inches and shall be Type S-1. All intersecting walkways shall have radius transitions. iii. Replace Concrete Walkway/Pad (Demo Concrete; Compact Existing Base; and Install Concrete Walkway) – The Contractor shall saw cut the concrete walkway/pad full width at the beginning and end of the removal area. All of the concrete spoils shall be removed from the site and shall be properly disposed of the material. The contractor shall compact the subgrade. The concrete shall be a thickness of 6-inches and the finished surface shall have a slip resistant broom finish. Portland cement concrete shall be 3000 psi with polypropylene fiber mesh additive, 6 inches thick and have a slip resistant broom finish. All intersecting walkways shall have radius transitions. iv. Seal (Seal Coat Asphalt Walkway) - The contractor shall power sweep the area to be seal coated prior to the application of the seal coat. The seal coat shall be heated and applied in a uniform layer at a rate of 0.20 and 0.35 gallons per square yard. v. Repair Shoulder – Sketch A has a note to repair shoulder located near the drinking water fountain. The contractor shall saw cut straight approximately 40 feet of jagged edge, install 70/30 mix to eliminate drop off. See Item g below for details. vi. Saw Cut – Throughout the park saw cutting the asphalt walkway, concrete walkway, and concrete pads for a park bench/drinking fountain/bike rack shows up in the work. The intent is to achieve a straight edge for cosmetic purposes prior to installing concrete or asphalt. g. Upon completion of the asphalt walkways and concrete walkways/pads, the contractor shall install 70/30 (sand/soil) mix and sod on all areas disturbed by construction activities, using fine hand grading and supplying topsoil mixture to bring Soil/Sod to even elevation with edge of new asphalt/concrete placement. Sod will be placed in the areas where sod existed before prior to the contractor starting the work. If there were no sod in the disturbed area prior to work, then the contractor shall place the 70/30 mix at a 3:1 slope to the walkway ADA compliant.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Key dates

Opened
10/8/2026
Closes
11/6/2026

Last updated

Details

Industry
Construction
NAICS
237310

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Miami-Dade County·Florida

Top match · 95%

International Gardens Park - Walkway Repairs Rebid

Closes 11/6/2026Opened 10/8/2026

Miami-Dade County·Florida

92% match

Olympic Park - Walkway Repairs Rebid

Closes 11/6/2026Opened 10/8/2026

Miami-Dade County·Florida

84% match

Olympic Park - Walkway Repairs Rebid

Closes 11/6/2026Opened 10/8/2026

Department of Parks, Recreation and Tourism·South Carolina

80% match

Golf Course Cart Path Paving-Hickory Knob State Resort Park

Closes 11/11/2026Opened 10/14/2026

City of Dania Beach·Florida

78% match

Sidewalk Rehabilitation Phase II

Closes 10/19/2026Opened 9/18/2026

New York City Department of Parks & Recreation·New York

78% match

MG-40550-117MA Mannahatta Park Recon

Closes 10/21/2026Opened 7/23/2026

California Construction Authority·California

78% match

Parking Lot A Paving Project

Closes 10/19/2026Opened 9/22/2026

City of Plano·Texas

78% match

Arterial Concrete Repair-Park Boulevard-US 75 to East City Limit, Project No. PW-S-00097

Closes 10/19/2026Opened 9/28/2026

City of Encinitas / San Dieguito Water·California

78% match

Park Equipment Replacement at Wiro and Orpheus Parks

Closes 11/12/2026Opened 10/15/2026

Miami-Dade County·Florida

78% match

Westwind Lakes Park - Playground Replacement

Closes 10/21/2026Opened 9/21/2026

North Carolina City of Lexington·North Carolina

78% match

Full Depth Asphalt Patching on Multiple City Streets

Closes 10/28/2026Opened 10/13/2026

South Carolina Parks, Recreation & Tourism·South Carolina

77% match

Golf Cart Path Paving at Hickory Knob SP

Closes 11/11/2026Opened 10/14/2026

Central Florida Tourism Oversight District·Florida

77% match

2027 Milling and Resurfacing Project

Closes 10/20/2026Opened 9/21/2026

City of Fort Myers·Florida

77% match

Asphalt Roadway Resurfacing and Rehabilitation

Closes 11/2/2026Opened 10/1/2026

Town of Coventry·Rhode Island

77% match

089-26 HARRIS PLAYGROUND PATH

Closes 10/20/2026Opened 10/6/2026

City of Englewood·Colorado

77% match

BELLEVIEW PARK ENHANCEMENTS

Closes 11/17/2026Opened 10/15/2026

Miami-Dade County·Florida

77% match

Zoo Miami - Splashpad Repairs

Closes 10/27/2026Opened 9/25/2026

Brazos Valley·Texas

77% match

CITY GOLF COURSE CART PATH AND HOLE REPAVING

Closes 11/6/2026Opened 10/13/2026

City of Fountain Inn·South Carolina

76% match

PD Terry Park Pickleball and Tennis Courts

Closes 10/22/2026Opened 10/1/2026

Needham Housing Authority·Massachusetts

76% match

ADA Ramp, Walkway and Patio

Closes 10/22/2026Opened 10/8/2026

Miami-Dade County Department of Transportation and Public Works·Florida

76% match

Resurfacing of SW 152nd Avenue FM 454982-1

Rolling / TBD closeOpened 8/28/2026

City of Lake Wales·Florida

76% match

RFP 27-02 GC Services for Kiwanis Park Loop Trail

Closes 11/4/2026Opened 9/30/2026

NYS Buffalo, City of·New York

76% match

Parkside Avenue Improvements

Closes 10/28/2026Opened 9/30/2026

Tampa International Airport·Florida

76% match

General Aviation Apron Rehabilitation

Closes 11/16/2026Opened 9/30/2026

Department of Conservation and Recreation·Virginia

76% match

DCR-VSP-Leesylvania SP- Paving

Closes 10/26/2026Opened 10/2/2026