The County of Clackamas is seeking a qualified contractor to execute the full scope of the NE Miley Road / NE Airport Road intersection improvement, which includes civil work, traffic‑control devices, signing, pavement markings, flashing beacons, and roadway illumination. The contract will be awarded on a competitive sealed‑bid basis and requires compliance with prevailing‑wage rules, CCB registration, bonding, and extensive utility coordination.
• Civil construction: earthwork, sub‑grade preparation, aggregate base, concrete work, and drainage/erosion‑control measures.
• Traffic‑control hardware: new MUTCD‑compliant signs, pavement striping, solar‑powered flashing beacons, and a full traffic‑signal mast‑arm with LED luminaire, power cabinet, conduit, and PTZ camera system.
• Utility coordination: notification and protection of existing water, gas, electric (PGE), telecom (NW Natural, Astound, CenturyLink/Lumen) services; installation of new conduit and power service.
• Administrative requirements: 10 % bid bond, 100 % performance/payment bonds, Good‑Faith‑Effort outreach to minority/women/ESB firms, first‑tier subcontractor disclosure, prevailing‑wage compliance, and a Workplace Harassment Prevention Plan.
• Schedule: work must be completed no later than June 30, 2027, with the bid opening on December 2, 2026 and a required “as‑built” submittal at closeout.