Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • New York guideNew York Bids and Bidding Guide
  • Compliance checkHow to Ensure RFP Compliance
  • How to answer an RFPChoosing and Responding to Government Bids
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›New York
  4. ›Closed bids
  5. ›Upper Bridge Feasibility Study

NYS Essex County·New York

Upper Bridge Feasibility Study

Closes 9/14/2026$200k – $1MRequest for ProposalLogin required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

RFPs are available at: https://www.co.essex.ny.us/bidders/publicbids.aspx. RFPs may be submitted electronically through Essex County VSS or mailed or delivered to: Essex County Purchasing, PO Box 217, 7551 Court Street, Elizabethtown, NY 12932. This study will provide the Keeseville Community and Essex County with options to preserve a nationally significant example of American Engineering, restore either vehicular of pedestrian access, create scenic viewpoints, and impove tranportation circulation through walkable, bikeable, or vehicular connections within the hamlet. With a population of approximately 2,000 residents, the hamlet serves as an important commercial and residential center for both residents and visitors. The Study will analyze pedestrian connecivity, vehicle access and safety, and historic preservation as they relate to quality of life and hamlet defelopment. Business enterprises awarded an identical or substantially similar procurement contract within the past five years: Barton & Laguidice - Solid Waste Study Service-Disabled Veteran-Owned Business (SDVOB) SDVOB Goal: 0.00% Minority / Women Business Enterprise contracting goals (MWBE) Total MWBE Goals: 30.00% Disadvantaged Business Enterprise contracting goals (DBE) DBE Goal: 6.00%

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Linda Wolf(Purchasing Agent)

[email protected]

(518) 873-3332

Key dates

Opened
8/12/2026
Closes
9/14/2026
Duration
15 months

Last updated

Details

Type
Request for Proposal
Industry
Civil Engineering
NAICS
541310
Solicitation №
260070

Budget estimate

$200,000 – $1,000,000

The budget for this project can be estimated based on the scope of work, which involves a feasibility study for a bridge. The cost of such a study can vary widely depending on the complexity of the project, the size of the bridge, and the requirements of the study. However, as a rough estimate, a feasibility study for a bridge can cost anywhere from $200,000 to $1,000,000 or more. The factors that may influence the likely payment range include the size and complexity of the bridge, the requirements of the study, and the experience and qualifications of the contractor.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Cherry Hill Township·New Jersey

Top match · 67%

2026 Downs Farm Bridge

Closes 10/16/2026Opened 10/6/2026

Town of Pulaski·Virginia

66% match

PROPOSED BRIDGE SUPERSTRUCTURE REPLACEMENT WEST COMMERCE STREET OVER PEAK CREEK

Closes 12/16/2026Opened 9/25/2026

Upstate Greenways and Trails Alliance·South Carolina

66% match

Swamp Rabbit Trail Orange Line Connection Feasibility Study

Closes 10/23/2026Opened 9/21/2026

Montana Department of Transportation·Montana

66% match

RFP - Lavina Ryegate Bridges STPB 14-4(26)147

Closes 11/5/2026Opened 10/7/2026

Delaware Valley Regional Planning Commission·Pennsylvania

66% match

Feasibility Study for Naylor's Run and Pennsy Trails (TCDI Project Category 5 – Transportation and Infrastructure Planning)

Closes 11/13/2026Opened 10/5/2026

Delaware Valley Regional Planning Commission·Pennsylvania

66% match

Cobbs Creek Trail Extension: Forge to Refuge Trail Advanced Feasibility Study (TCDI Project Category 5 – Transportation and Infrastructure Planning)

Closes 10/16/2026Opened 9/4/2026

Delaware Valley Regional Planning Commission·Pennsylvania

66% match

Valley Forge Gateway Trail Feasibility Study (TCDI Project Category 5 – Transportation and Infrastructure Planning)

Closes 10/14/2026Opened 8/14/2026

Town of Southington·Connecticut

65% match

Replacement of Bridge No. 04560, Newell Street over Quinnipiac River

Closes 10/14/2026Opened 9/16/2026

City of Elizabeth·New Jersey

65% match

Feasibility Study for Ferry Service Consultant Inquiries and the Citys Responses.pdf

Rolling / TBD closeOpened 3/24/2026

Georgia City of South Fulton·Georgia

65% match

Greenway Feasibility Study

Closes 10/29/2026Opened 9/11/2026

City of Rogers·Arkansas

65% match

SS4A US-71B Corridor Study and Railyard Loop Trail Undercrossing Feasibility Studies Request for Letters of Interest

Closes 11/3/2026Opened 10/11/2026

Washington DC Transportation (DDOT)·District of Columbia

65% match

Rehabilitation/Reconstruction of 27th Street Bridge over Broad Branch Stream

Closes 10/26/2026Opened 9/24/2026

Missouri Department of Transportation·Missouri

65% match

STL District, University City, removal of the bridge on Kempland Place crossing River Des Peres

Closes 10/20/2026Opened 9/15/2026

U.S. Virgin Islands GVIBUY·U.S. Virgin Islands

64% match

Spring Gut Road Bridge Replacement

Closes 10/14/2026Opened 8/24/2026

Alaska Department of Transportation and Public Facilities·Alaska

64% match

NOTICE OF FLOOD ENCROACHMENT & INTENT TO BEGIN ENGINEERING AND ENVIRONMENTAL STUDIES: Moose Creek Bridge and Moose Creek

Closes 10/23/2026Opened 9/24/2026

City of St. Louis·Missouri

64% match

Union Lindell Bridge Replacement

Closes 10/20/2026Opened 9/16/2026

U.S. Department Of Agriculture·Michigan

64% match

Cisco Branch Ontonagon River Bridge Replacement

Closes 10/26/2026Opened 10/5/2026

City of St. Louis Board of Public Service·Missouri

64% match

Union Lindell Bridge Replacement

Closes 10/20/2026Opened 9/16/2026

City of Cedar Rapids·Iowa

64% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

City of Cedar Rapids·Iowa

64% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

Massachusetts City of Salem·Massachusetts

64% match

27-19-PLAN Danvers-Peabody-Salem Rail Trail Feasibility Study

Closes 10/14/2026Opened 9/9/2026

City of Rogers·Arkansas

64% match

Request for Letters of Interest – US‑71B Corridor Study & Railyard Loop Trail Undercrossing Feasibility Studies

Closes 11/3/2026Opened 10/11/2026

U.S. Department Of Defense·Tennessee

64% match

Ensley Engineer Yard East Connector Bridge

Closes 10/16/2026Opened 10/7/2026

City of Cedar Rapids·Iowa

64% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

City of Cedar Rapids·Iowa

64% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026