Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • Pennsylvania guidePennsylvania Bids and Bidding Guide
  • Compliance checkHow to Ensure RFP Compliance
  • How to answer an RFPChoosing and Responding to Government Bids
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Pennsylvania
  4. ›Valley Forge Gateway Trail Feasibility Study (TCDI Project Category…

Delaware Valley Regional Planning Commission·Pennsylvania

Valley Forge Gateway Trail Feasibility Study (TCDI Project Category 5 – Transportation and Infrastructure Planning)

Closes 10/14/2026$500k – $1MRequest for Proposal
Get bids like this by emailBid source

Description

The Delaware Valley Regional Planning Commission (DVRPC) is soliciting a pre‑qualified consulting firm to conduct a comprehensive feasibility study for Segment 7 of the Valley Forge Gateway Trail, a 2.8‑mile multi‑use trail linking the Schuylkill River Trail and Chester Valley Trail. The study must evaluate alignment alternatives, structural crossing concepts over US 202 and I‑76 ramps, environmental and permitting issues, and develop a preferred alternative with cost estimates and an implementation strategy. Deliverables include technical memoranda, GIS mapping, public‑engagement plans, conceptual engineering drawings, and a final feasibility report, all to be completed by June 30 2028. • Conduct project management, coordination, and bi‑monthly status meetings. • Perform existing conditions inventory and GIS mapping. • Develop at least three alignment alternatives (including a No‑Build option) and evaluate them against safety, constructability, and cost criteria. • Produce conceptual crossing designs (bridges, tunnels, etc.) and assess impacts on roadway operations. • Complete environmental screening, permitting matrices, and regulatory reviews (NEPA, wetlands, historic resources). • Implement a stakeholder engagement program with three public meetings, up to ten interviews, and online tools. • Deliver a preferred‑alternative concept plan, order‑of‑magnitude cost estimate, and implementation strategy. • Submit final report with all technical, GIS, and CAD files by the contract deadline.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Spencer Gober

[email protected]

(215) 238-2884

Key dates

Opened
8/14/2026
Questions due
8/28/2026
Closes
10/14/2026
Projected award
10/30/2026
Duration
20 months

Last updated

Details

Type
Request for Proposal
Industry
Civil Engineering
NAICS
541330
Solicitation №
27-67-106

Budget estimate

$500,000 – $1,000,000

The RFP does not disclose a budget, but similar multi‑use trail feasibility studies for a 2‑3 mile segment in the Greater Philadelphia region typically range from $500,000 to $1,000,000. The estimate accounts for staff salaries (project manager, engineers, planners, GIS specialists), public‑engagement activities, travel, and the production of technical deliverables (reports, drawings, GIS files). Complexity of crossing major highways (US 202 and I‑76 ramps) and the required environmental screening push the upper end of the range.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Delaware Valley Regional Planning Commission·Pennsylvania

Top match · 93%

Cobbs Creek Trail Extension: Forge to Refuge Trail Advanced Feasibility Study (TCDI Project Category 5 – Transportation and Infrastructure Planning)

Closes 10/16/2026Opened 9/4/2026

Delaware Valley Regional Planning Commission·Pennsylvania

91% match

Feasibility Study for Naylor's Run and Pennsy Trails (TCDI Project Category 5 – Transportation and Infrastructure Planning)

Closes 11/13/2026Opened 10/5/2026

Delaware Valley Regional Planning Commission·Pennsylvania

84% match

Chester City Microtransit Feasibility Study (TCDI Project Category 5 – Transportation and Infrastructure Planning)

Closes 10/30/2026Opened 9/23/2026

Massachusetts City of Salem·Massachusetts

84% match

27-19-PLAN Danvers-Peabody-Salem Rail Trail Feasibility Study

Closes 10/14/2026Opened 9/9/2026

Georgia City of South Fulton·Georgia

83% match

Greenway Feasibility Study

Closes 10/29/2026Opened 9/11/2026

Delaware Valley Regional Planning Commission·Pennsylvania

83% match

Exton Crossroads Streetscape and Mobility Plan (TCDI Project Category 5 – Transportation and Infrastructure Planning)

Closes 10/19/2026Opened 9/16/2026

City of Green Cove Springs·Florida

81% match

St. Johns River Trail - Phase 1 (Design)

Closes 11/9/2026Opened 10/8/2026

City of Keene·New Hampshire

81% match

THT Phase#2, NHDOT#45251 Design Project

Closes 11/19/2026Opened 10/9/2026

Northampton County·Pennsylvania

80% match

County of Northampton Gracedale Site Infrastructure Feasibility Study and Phased Development Plan

Closes 11/12/2026Opened 10/13/2026

City of Rogers·Arkansas

80% match

SS4A US-71B Corridor Study and Railyard Loop Trail Undercrossing Feasibility Studies Request for Letters of Interest

Closes 11/3/2026Opened 10/11/2026

Upstate Greenways and Trails Alliance·South Carolina

80% match

Swamp Rabbit Trail Orange Line Connection Feasibility Study

Closes 10/23/2026Opened 9/21/2026

Georgia Cobb County Department of Transportation·Georgia

80% match

B2432 - Chattahoochee River Trail, Phase II

Closes 1/15/2027Opened 9/28/2026

Connecticut Department of Transportation·Connecticut

80% match

RFP - Technical Proposal - Quinebaug River Trail in the Town of Plainfield

Closes 10/28/2026Opened 9/9/2026

Illinois Natural Resources·Illinois

80% match

Recreational Corridor greenways and trails planning

Rolling / TBD closeOpened 7/1/2026

City of Keene·New Hampshire

79% match

THT Phase#2, NHDOT#45251 Design Project

Closes 11/19/2026Opened 10/9/2026

City of Flagstaff, AZ·Arizona

79% match

Professional Engineering Services for Lone Tree Road Feasibility Study, O'Leary St to J.W. Powell Blvd

Closes 11/5/2026Opened 9/25/2026

City of Rogers·Arkansas

79% match

Request for Letters of Interest – US‑71B Corridor Study & Railyard Loop Trail Undercrossing Feasibility Studies

Closes 11/3/2026Opened 10/11/2026

City of Durham·North Carolina

79% match

Gateway Plaza & Base Trail

Closes 10/27/2026Opened 9/15/2026

Georgia Cobb County Department of Transportation·Georgia

78% match

Notice of Intent to Advertise - Design Build Services for the Chattahoochee River Trail Project

Closes 1/15/2027Opened 9/10/2026

City of Phoenix·Arizona

78% match

GRAND CANAL PHASE IV - 47TH AVENUE TO 23RD AVENUE PLANNING STUDY

Closes 10/30/2026Opened 10/8/2026

Virginia Department of Transportation·Virginia

78% match

B05_2026 SCENIC TRAIL CONSTRUCTION

Closes 10/28/2026Opened 8/11/2026

Georgia Columbus Consolidated Government·Georgia

78% match

RFB No. 27-0006 Dragonfly Trail - River Road Segment

Closes 10/21/2026Opened 8/18/2026

City of Fairfax·Virginia

78% match

Concept Feasibility Study, Fairfax Circle

Closes 11/12/2026Opened 10/9/2026

City of Portsmouth·New Hampshire

78% match

Portsmouth Seacoast Greenway Trailheads Design and Engineering

Closes 10/19/2026Opened 8/24/2026

Virginia Department of Transportation·Virginia

78% match

B02_2026 SCENIC TRAIL CONSTRUCTION

Closes 10/28/2026Opened 8/11/2026