The Harbor Beach Renovation Project is a comprehensive construction effort for Harbor Beach Community Schools, encompassing an office addition and extensive interior and exterior renovations. The scope includes selective demolition, new cast‑in‑place concrete, masonry, structural steel, metal framing, rough carpentry, thermal and moisture protection, doors and glazing, interior finishes (gypsum board, tile, acoustical ceilings, painting), specialty items (toilet accessories, fire protection cabinets), equipment installation, furnishings, fire‑suppression systems, plumbing, HVAC, electrical, communications, site earthwork, paving, storm‑water utilities, and related site improvements. Bidders must submit detailed plans, specifications, and cost proposals for all listed divisions and comply with numerous industry standards (ACI, ASTM, etc.).
• Office addition and interior remodels
• Selective demolition with salvage/reuse requirements
• Structural concrete, steel framing, and masonry work
• Complete mechanical, electrical, plumbing, and fire‑suppression systems
• Interior finishes including flooring, ceilings, painting, and specialty equipment
• Exterior site work: paving, turf restoration, storm‑water utilities, utility drainage
• Mandatory adherence to extensive product and quality‑control submittals
• Project located at 402 S 5th St, Harbor Beach, MI 48441