Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • California guideCalifornia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›California
  4. ›Construction
  5. ›Residential and Arterial Pavement Improvement, I-159/I-139

City of Torrance·California

Residential and Arterial Pavement Improvement, I-159/I-139

Closes 11/18/2026$800k – $1.5MInvitation for Bid
Get bids like this by emailBid source

Description

This City of Torrance project modernizes roughly 4 million sq ft of residential streets and several arterial corridors (I‑159/I‑139) through cold‑mill removal and asphalt overlay, accompanied by curb‑and‑gutter replacement, new tree planting, signage, crosswalk and pavement‑striping upgrades, and parking‑lot resurfacing in two city parks. The work must be completed within a 200‑working‑day construction window and requires compliance with California prevailing‑wage rules, extensive environmental BMPs, and full bonding (10 % bid bond, 100 % performance and labor‑material bonds). • Replace/overlay ~4 M sq ft of residential and arterial pavement, including full‑depth milling and new asphalt concrete. • Install new curb‑and‑gutter systems, ADA‑compliant curb ramps, traffic‑control signage, portable changeable‑message signs, speed‑bump units, and high‑visibility crosswalks. • Remove existing trees, prune roots, and plant 13 new trees (various species) as part of site landscaping and storm‑water mitigation.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Beth Overstreet

[email protected]

(310) 618-3074

Key dates

Opened
10/18/2026
Questions due
11/10/2026
Closes
11/18/2026
Duration
200 working days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
B2026-19

Budget estimate

$800,000 – $1,500,000

The solicitation estimates the total contract value at $15.5 M–$16.5 M. Assuming a typical contractor profit margin of 5‑10 % after covering labor, materials, bonds, and overhead, the net earnings for the prime contractor would likely fall between roughly $775,000 and $1.65 M. Variations in scope (e.g., tree‑planting, traffic‑control hardware) and subcontractor pricing could shift the range upward or downward.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

California Department of Transportation·California

Top match · 80%

Replace AC Surf, RHMA overlay, drainage, curb ramps, & electrical.

Closes 11/10/2026Opened 9/21/2026

The City of Anaheim·California

80% match

Katella Ave & State College Blvd Rehabilitation Project

Closes 11/5/2026Opened 10/15/2026

San Joaquin County Department of Public Works·California

79% match

Main Street Resurfacing, Federal Aid Project No. STPL‑5929(334)

Closes 11/5/2026Opened 10/6/2026

NYS Buffalo, City of·New York

79% match

Parkside Avenue Improvements

Closes 10/28/2026Opened 9/30/2026

City of San Clemente·California

79% match

FY 2027 Arterial Street Improvement

Closes 11/5/2026Opened 10/15/2026

Los Angeles County Public Works·California

79% match

RMD1402001 Hacienda Heights - Hacienda Boulevard Phase 1

Closes 11/17/2026Opened 10/20/2026

City of Redlands·California

79% match

2026 Alley Paving Improvement Project

Closes 10/27/2026Opened 10/8/2026

City of Dania Beach·Florida

79% match

Sidewalk Rehabilitation Phase II

Closes 10/26/2026Opened 9/18/2026

City of Riverside·California

79% match

Stover Avenue Sidewalk Improvements (Fury Drive to Eagle Rock Drive)

Closes 11/9/2026Opened 10/8/2026

City of Cleveland·Ohio

79% match

101-26 - 2026 Recycled Asphalt Demo Project

Closes 10/23/2026Opened 9/11/2026

California Department of Transportation·California

79% match

Curb ramp, CRCP, JPCP, HMA, electrical, erosion control, and planting.

Closes 11/17/2026Opened 9/28/2026

City of Coronado·California

78% match

Downtown Enhancements – Phase 1

Closes 11/12/2026Opened 10/8/2026

Miami-Dade County Department of Transportation and Public Works·Florida

78% match

Resurfacing of SW 152nd Avenue FM 454982-1

Rolling / TBD closeOpened 8/28/2026

City of Palmdale·California

78% match

Arterial Maintenance Overlay PMP

Closes 11/10/2026Opened 10/8/2026

Tacoma·Washington

78% match

Pedestrian Mobility & Safety Improvements at South 56th St and Pacific Ave

Closes 10/27/2026Opened 9/29/2026

City of Modesto, CA·California

78% match

TUOLUMNE BOULEVARD PAVEMENT REHABILITATION

Closes 10/27/2026Opened 9/1/2026

Miami-Dade County·Florida

78% match

International Gardens Park - Walkway Repairs Rebid

Closes 11/6/2026Opened 10/8/2026

Town of Prosper·Texas

78% match

Coit Road Paving and Drainage Improvements (Prosper Trail-1400' North of Frontier), CIP 2534-ST

Closes 11/5/2026Opened 10/9/2026

County of Los Angeles Department of Public Works·California

78% match

RMD1402001 - Hacienda Heights - Hacienda Boulevard Phase I

Closes 11/17/2026Opened 10/20/2026

City of Santa Rosa·California

77% match

Downtown Connectivity to Support Housing Density

Closes 10/28/2026Opened 9/11/2026

Needham Housing Authority·Massachusetts

77% match

ADA Ramp, Walkway and Patio

Closes 10/22/2026Opened 10/8/2026

City of Vernon·California

77% match

Atlantic Bridge Localized Pavement Repair & Bandini Blvd. Street Improvements -- Indiana Street to Sunol Drive

Closes 11/17/2026Opened 10/19/2026

City of Fresno·California

77% match

Chestnut Neighborhood Sidewalks

Closes 11/17/2026Opened 10/16/2026

City of Williamsburg·Virginia

77% match

IFB 08 4101 27 FY27 Citywide Street Resurfacing

Closes 10/27/2026Opened 10/5/2026

Clark County·Nevada

77% match

Las Vegas Boulevard - Flamingo Road to Spring Mountain Road (Phase G) and Flamingo Road - I-15 to Koval Lane

Closes 11/4/2026Opened 10/14/2026