Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • Nevada guideNevada Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Nevada
  4. ›Las Vegas Boulevard - Flamingo Road to Spring Mountain Road (Phase…

Clark County·Nevada

Las Vegas Boulevard - Flamingo Road to Spring Mountain Road (Phase G) and Flamingo Road - I-15 to Koval Lane

Closes 11/4/2026$4M – $9MInvitation for Bid
Get bids like this by emailBid source

Description

This publicly‑funded roadway improvement contract covers roughly 1.75 miles of arterial streets in Clark County, Nevada, combining roadway resurfacing, curb & gutter work, sidewalk upgrades, utility relocation, traffic‑signal upgrades, storm‑drain installation, and the deployment of LED “Smart” street‑lighting with associated power and communications infrastructure. The project includes extensive civil works, utility coordination, and ADA‑compliant sidewalk reconstruction, making it suitable for multidisciplinary construction firms with experience in heavy civil engineering, utility integration, and intelligent‑transportation‑system (ITS) installations. • Scope includes cold planing, plant‑mix bituminous surfacing, and Ultra‑Thin Asphalt Concrete Surface (UTACS) for both Las Vegas Boulevard and Flamingo Road. • Comprehensive utility work: new waterline replacement, power/communication conduit, storm‑drain installation, and traffic‑signal detector loops. • Full street‑lighting upgrade to LED “Smart” poles with integrated communication modules and landscape lighting conversion. • Sidewalk, curb, gutter, median, and bus‑turnout reconstruction to meet ADA standards. • Estimated contract value $81 M‑$90 M, requiring compliance with Nevada prevailing‑wage rates for all labor classifications.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Scott Basquiat‑Jones(Purchasing Analyst II)

(702) 455‑4441

Key dates

Opened
10/14/2026
Pre-bid meeting
10/21/2026
Closes
11/4/2026

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
608087‑26

Budget estimate

$4,000,000 – $9,000,000

The solicitation lists an estimated contract value between $81.1 M and $89.7 M. Assuming a typical contractor profit margin of 5‑10 % for large‑scale public‑works projects, the expected earnings (gross profit) would likely fall in the $4 M‑$9 M range. Factors influencing the final budget include the firm’s efficiency, prevailing‑wage labor costs, and any change‑order allowances.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Nevada Government·Nevada

Top match · 86%

Wyoming Avenue Improvements - Industrial Rd to Las Vegas Blvd

Closes 10/21/2026Opened 9/17/2026

Clark County·Nevada

85% match

Federal Project No. STBG-0003-(370) - Pebble Road - Las Vegas Boulevard to Eastern Avenue

Closes 10/19/2026Opened 9/22/2026

Nevada Government·Nevada

85% match

FEDERAL PROJECT NO. STBG-0003-(371) - DESERT INN ROAD - 1,250' W/O CIMARRON ROAD TO BRONCO STREET

Closes 10/14/2026Opened 9/23/2026

Nevada Government·Nevada

84% match

Federal project No. STBG-0003-(370) - PEBBLE ROAD - LAS VEGAS BOULEVARD TO EASTERN AVENUE

Closes 10/20/2026Opened 9/22/2026

Clark County·Nevada

83% match

Federal Project No. STBG-0003-(371) Desert Inn Road - 1,250' W/O Cimarron Road to Bronco Street

Closes 10/14/2026Opened 9/23/2026

Nevada Government·Nevada

82% match

D2 Little Lane Rehabilitation Project

Closes 10/20/2026Opened 9/22/2026

City of Riverside·California

81% match

Stover Avenue Sidewalk Improvements (Fury Drive to Eagle Rock Drive)

Closes 11/9/2026Opened 10/8/2026

LA Public Works Engineering Bureau·California

81% match

AVALON BOULEVARD IMPROVEMENTS MARTIN LUTHER KING JR BOULEVARD TO 56TH STREET (VISION ZERO PROGRAM)

Closes 11/4/2026Opened 9/30/2026

Clark County·Nevada

81% match

Cottonwood Avenue Ponding Mitigation and Sim Street Improvement

Closes 11/3/2026Opened 10/13/2026

City of Fresno·California

80% match

Pave More Now Package S-2.1: Bullard & Forkner Traffic Signal & Sidewalk Upgrades and Herndon EB Left-Turn Extension

Closes 11/10/2026Opened 10/9/2026

City of Evanston·Illinois

80% match

BID 26-45 Traffic Signal Improvements Project

Closes 10/20/2026Opened 8/27/2026

California Department of Transportation·California

80% match

Mod Sig & Ltg, Pvmt repair, SW, curb ramp, segmental Conc Ret system.

Closes 11/5/2026Opened 10/5/2026

California Department of Transportation·California

80% match

ADA curb ramps, high tension cable barrier, and LED lighting.

Closes 11/5/2026Opened 9/21/2026

LA Public Works Engineering Bureau·California

80% match

SIDEWALK REPAIR PROGRAM PACKAGE NO. 89 (LA 28)

Closes 10/14/2026Opened 9/9/2026

City of Modesto, CA·California

80% match

TUOLUMNE BOULEVARD PAVEMENT REHABILITATION

Closes 10/27/2026Opened 9/1/2026

City of West Hollywood·California

79% match

CIP 2605-IN-ROADWAY WARNING LIGHTS PROJECT

Closes 10/14/2026Opened 8/26/2026

City of Tracy·California

79% match

Traffic Signal Installation at Tracy Boulevard and Gandy Dancer Drive

Closes 10/28/2026Opened 9/26/2026

City of Rancho Cordova·California

79% match

2026 ADA Sidewalk Improvement Project

Closes 10/21/2026Opened 9/30/2026

Clark County·Nevada

79% match

Annual Requirements Contract for Traffic Signal and Street Light Wire

Closes 11/3/2026Opened 10/12/2026

City of Dania Beach·Florida

79% match

Sidewalk Rehabilitation Phase II

Closes 10/19/2026Opened 9/18/2026

Idaho Transportation Department·Idaho

79% match

Key No. 13905 N 10TH AVE ITS & OVERLAY

Closes 11/3/2026Opened 10/10/2026

Henrico County·Virginia

79% match

Shady Grove Road & Old Nuckols Road Safety & Mobility Improvements

Closes 10/14/2026Opened 9/18/2026