Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Connecticut guideConnecticut Bids and Bidding Guide
  • Compliance checkHow to Ensure RFP Compliance
  • How to answer an RFPChoosing and Responding to Government Bids
More renewable energy bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Connecticut
  4. ›Closed bids
  5. ›Solar & Battery Storage at New London High School

City of New London·Connecticut

Solar & Battery Storage at New London High School

Closes 8/9/2023$1M – $3MRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of New London is seeking a design‑build‑own‑operate‑maintain (DBOOM) partner to install a rooftop solar photovoltaic (PV) system (up to 249 kW‑AC) and an optional battery‑energy‑storage system (BESS) at New London High School. The contractor will be responsible for full engineering, permitting, construction, interconnection, commissioning, 20‑year power‑purchase‑agreement (PPA) operations, and eventual de‑commissioning. The project is funded through the Connecticut Z‑REC program and may also participate in the Connecticut Energy Storage Solutions Program for the battery component. Local‑vendor and workforce preferences apply, along with extensive insurance and bonding requirements. • Design, permit, and construct a code‑compliant rooftop solar PV system (max 249 kW‑AC) and optional BESS. • Provide long‑term O&M, monitoring, and reporting under a 20‑year fixed‑price PPA, with up‑to‑two 5‑year extensions. • Meet ZREC Year 10 tariff requirements, obtain utility interconnection, and satisfy local vendor/ workforce preferences (15 % price‑preference, 25 % local labor, 25 % female/minority).

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Joshua Montague(Purchasing Agent)

[email protected]

(860) 447-5215

Key dates

Opened
7/5/2023
Questions due
7/21/2023
Closes
8/9/2023
Projected award
10/23/2023
Duration
20 years

Last updated

Details

Type
Request for Proposal
Industry
Renewable Energy
NAICS
238210
Solicitation №
2024-01 CONL

Budget estimate

$1,000,000 – $3,000,000

No total contract value is disclosed. Based on a 249 kW‑AC solar system at roughly $6–$8 per watt installed (typical for school rooftop projects) plus a comparable battery component, the total contract could range from about $1.5 million to $3 million. The estimate also considers design, permitting, O&M over 20 years, bonding, and insurance costs.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Sweetwater Union High School District·California

Top match · 66%

District-Wide Uninterrupted Power Supply (UPS) Battery Replacement

Closes 11/10/2026Opened 10/9/2026

Louisiana University of New Orleans·Louisiana

65% match

solar panel and batteries install

Closes 10/19/2026Opened 9/9/2026

Putnam Valley Central School District·New York

65% match

GEOTHERMAL UPGRADES + NURSE SUITE

Closes 10/27/2026Opened 10/2/2026

Madison County School District·Mississippi

65% match

14-2027 Battery Backups (E-Rate)

Closes 11/10/2026Opened 10/8/2026

Prince William County Schools·Virginia

64% match

Mobile STEM Learning Environment

Closes 11/12/2026Opened 10/12/2026

San Gabriel Unified School District·California

64% match

2022-0617 - WILSON ELEMENTARY SCHOOL INTERIM HOUSING - BIDDING SET

Rolling / TBD closeOpened 8/4/2026

Northeast Wisconsin Technical College·Wisconsin

64% match

Green Bay Campus Rooftop Solar

Closes 11/3/2026Opened 10/12/2026

St. Tammany Parish School Board·Louisiana

63% match

BID #1899 MODULAR BUILDING LEASE FOR BOYET JUNIOR HIGH SCHOOL

Closes 10/23/2026Opened 10/7/2026

LAUSD·California

63% match

2710051-52 MANCHESTER AVE ES & LUCILLE ROYBAL-ALLARD ES - SEEDS (PSA)

Closes 10/15/2026Opened 9/23/2026

Hanover County·Virginia

63% match

27-85-3360SH HVAC and Ceiling Replacement Chickahominy Middle School

Closes 10/15/2026Opened 9/14/2026

Sweetwater Union High School District·California

62% match

Castle Park High School Parking Lot Rehabilitation

Closes 11/3/2026Opened 10/10/2026

Massachusetts Southwick-Tolland-Granville Regional School District·Massachusetts

62% match

Southwick Regional School Digital Sign Project

Closes 10/23/2026Opened 10/7/2026

Ozarks Transportation Organization·Missouri

62% match

Solar Powered School Zone Flashing Beacon Sign Packages

Closes 10/30/2026Opened 10/7/2026

Rapides Parish School Board·Louisiana

62% match

Bid 11-27-02A: Purchase and Installation of Weight Room Equipment at Tioga High School

Closes 10/28/2026Opened 10/7/2026

Georgia Bulloch County Board of Education·Georgia

61% match

Stilson Elementary School New Generator and Lighting Replacement

Closes 10/20/2026Opened 9/11/2026

New York State Energy Research and Development Authority·New York

61% match

New York School Bus Incentive Program

Closes 12/30/2030Opened 12/16/2024

New York State Energy Research and Development Authority·New York

61% match

Affordable Solar and Storage Predevelopment and Technical Assistance

Closes 12/31/2029Opened 12/19/2024

61% match

Liberty High

Closes undefinedOpened

The University of North Carolina·North Carolina

61% match

Frank Porter Graham Student Union - Solar Array Expansion

Closes 11/3/2026Opened 10/8/2026

Nyack Public Schools·New York

61% match

Capital Projects Update 6-6-23(opens in new window/tab)

Rolling / TBD closeOpened 3/5/2024

Connecticut YWCA Hartford Region·Connecticut

61% match

Solar Panels at YWCA Hartford Region

Closes 10/19/2026Opened 9/15/2026

St. Tammany Parish School Board·Louisiana

61% match

Boyet Jr. High School, Infrastructure and Coordination for Modulars, STPSB Project No. 2511

Closes 10/15/2026Opened 9/16/2026

Richland County School District One·South Carolina

61% match

Provide Industrial Material Handling Equipment

Closes 10/16/2026Opened 10/7/2026

South Huntington School District·New York

61% match

Home‑to‑School Student Transportation Services

Rolling / TBD closeOpened 4/2/2024

Georgia Columbia County Board of Education·Georgia

61% match

CCSD EHS LSH MUSIC FURNITURE FOR BID HC-10-16-26A

Closes 10/16/2026Opened 9/18/2026