Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Minnesota guideMinnesota Bids and Bidding Guide
  • Education RFPsEducation Bids and Bidding Guide
  • How to answer an RFPChoosing and Responding to Government Bids
More education bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Minnesota
  4. ›Closed bids
  5. ›Moos Tower Dentistry Clinic Renovation

University of Minnesota·Minnesota

Moos Tower Dentistry Clinic Renovation

Closes 4/27/2026$10M – $20MRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The University of Minnesota is seeking a design team to provide professional design services for the comprehensive renewal and modernization of the School of Dentistry located within Malcolm Moos Health Sciences Tower on the Twin Cities Campus. The project aims to create a state-of-the-art teaching and clinical environment that reflects contemporary dental education and practice standards while addressing critical building infrastructure needs. The design team will be responsible for providing all services and deliverables necessary to complete predesign, schematic design, design development, construction documents, bidding, and construction administration. The project will be delivered via a Construction Manager at Risk (CM@R) method. Key components of the project include modernizing pre-clinical and clinical teaching laboratories, reconfiguring clinic floors, establishing a patient-centered front-door, and upgrading building systems infrastructure. Some of the key features of the project are: • Modernization of 80,000 sq ft on floors 4 and 8 • Reconfiguration of clinic floors to support team-based comprehensive care • Establishment of a true patient-centered front-door • Upgrades to building systems infrastructure • Incorporation of sustainable design strategies consistent with University goals The project has a construction budget of $105,000,000 and is expected to be completed in 36 months.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Heather Winkler(Design Project Manager)

[email protected]

Key dates

Opened
4/6/2026
Questions due
4/17/2026
Pre-bid meeting
4/14/2026Mandatory
Site visit
4/14/2026Mandatory
Closes
4/27/2026
Duration
36 months

Last updated

Details

Type
Request for Proposal
Industry
Education
NAICS
541310
Solicitation №
26-02 Addendum 1

Budget estimate

$10,000,000 – $20,000,000

Based on the project description, the estimated budget for this project can be estimated to be in the range of $10 million to $20 million, considering the construction budget of $105 million and the typical fees for design services. The budget will depend on the scope of work, the complexity of the project, and the experience of the design team. Factors that may influence the likely payment range include the level of competition, the quality of the proposal, and the negotiation skills of the design team.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Oregon South County Health District·Oregon

Top match · 69%

Dental Clinic Remodel Project

Closes 10/28/2026Opened 8/31/2026

The Ohio State University·Ohio

63% match

OSU-265465, MMP Rm 1080 and 1092 Renovations

Closes 10/29/2026Opened 10/7/2026

Monterey County·California

63% match

MEDICAL-SURGERY 3 RENOVATION

Closes 10/15/2026Opened 9/3/2026

University of Louisville·Kentucky

63% match

Fresh Tissue Lab Renovation | CM/GC

Closes 11/3/2026Opened 10/9/2026

Medical University of South Carolina·South Carolina

62% match

MUHA 410 Brighton PTOT

Closes 10/23/2026Opened 10/12/2026

Town of Medfield, Massachusetts·Massachusetts

62% match

Building 1 Renovations

Closes 10/20/2026Opened 9/23/2026

Department of Behavioral Health and Developmental Disabilities·South Carolina

62% match

Anderson MHC Building Improvements

Closes 10/28/2026Opened 9/18/2026

NYS OGS Design & Construction - Construction Contractors·New York

62% match

Replace Roofs & Repair Facade, Building 73 (Project 45791‑C, H, P, E)

Closes 10/21/2026Opened 9/11/2026

Dallas County Hospital District d/b/a Parkland Health·Texas

62% match

IFB# 2027028 Pediatric Behavioral Health Construction

Closes 10/20/2026Opened 9/10/2026

U.S. Department Of Veterans Affairs·Kansas

62% match

Z2DA--589A7-23-306 Renovate Bldg. 5 & 5B for Mental Health FY27 NRM

Closes 10/19/2026Opened 10/1/2026

Missouri University of Science and Technology·Missouri

62% match

TJ Hall Strategic Improvements (RC000845)

Closes 10/19/2026Opened 10/6/2026

U.S. Department Of Defense·Alabama

62% match

Medical Repair and Renewal (MRR) Korea

Closes 10/19/2026Opened 9/15/2026

U.S. Department Of Veterans Affairs·Virginia

62% match

Z2DA--Renovate Space for Patient Care Improvements

Closes 10/29/2026Opened 7/31/2026

U.S. Department Of Veterans Affairs·Alabama

61% match

Y1DA | 521-24-102 | Renovate Wards 2K and 2B for Optometry/Ophthalmology Clinical Use

Closes 11/12/2026Opened 10/13/2026

Mankato MN, City of·Minnesota

61% match

2027 Balcerzak Water Tower Rehabilitation

Closes 10/15/2026Opened 9/17/2026

U.S. Department Of Health And Human Services·North Dakota

61% match

Fort Yates Pharmacy USP Renovation

Closes 10/20/2026Opened 10/5/2026

Ferris State University·Michigan

61% match

Allied Health Building Renovation - Professional Design Services

Closes 10/22/2026Opened 10/1/2026

Jamestown-Yorktown Foundation·Virginia

61% match

Jamestown Yorktown Foundation Digital Media Studio 425-B5425-011

Closes 10/20/2026Opened 9/3/2026

Medical University of South Carolina (MUSC)·South Carolina

61% match

MUSC PT Clinic 410 Brighton #H-FY27-0-021-PDC-CAPX

Closes 10/23/2026Opened 10/14/2026

U.S. Department Of Veterans Affairs·New York

61% match

Building 13 Stair and Roof Replacement at Castle Point VAMC

Closes 11/4/2026Opened 10/1/2026

U.S. Department Of Defense·Missouri

61% match

Veterans Affairs St. Louis Health Care System (VASTLHCS) John Cochran (JC) Hospital in St. Louis, Missouri

Closes 11/12/2026Opened 10/2/2026

Oregon Confederated Tribes of Siletz Indians·Oregon

61% match

CTSI SCHC Siletz Health Cliinc Remodel

Closes 11/10/2026Opened 9/28/2026

Medical University Hospital Authority (MUHA)·South Carolina

61% match

MUSC CSB 4th Floor Corridor Renovation

Closes 10/15/2026Opened 9/14/2026