Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • Compliance checkHow to Ensure RFP Compliance
  • How to answer an RFPChoosing and Responding to Government Bids
More engineering services bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›California
  4. ›Closed bids
  5. ›Wastewater Treatment Plants Influent Improvements Alternative Analyses

City of Roseville·California

Wastewater Treatment Plants Influent Improvements Alternative Analyses

Closes 10/6/2026$300k – $600kRequest for ProposalLogin required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Roseville is soliciting qualified engineering firms to conduct a comprehensive alternatives analysis for influent improvements at its Dry Creek and Pleasant Grove Wastewater Treatment Plants. The study will evaluate headworks screening, pump capacity, flow‑shaving configurations, basin return pump station operations, and future headworks configuration, delivering a Preliminary Design Report with recommended alternatives and optional 10 % design development. • Scope covers data collection, alternative generation (up to 4 per issue), detailed analysis of up to 3 alternatives, cost and risk assessment, and a consolidated design report. • Optional 10 % design phase may be added for selected alternatives. • Project management, monthly reporting, and invoicing are required. • Pre‑proposal conference on Sep 9, 2026; final questions due Sep 23, 2026; proposal due Oct 6, 2026. • Award anticipated Dec 16, 2026 with services beginning Dec 17, 2026.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Tracie Mueller(Bid Contact)

[email protected]

(916) 746-1854

Key dates

Opened
8/21/2026
Questions due
9/23/2026
Pre-bid meeting
9/9/2026
Closes
10/6/2026
Projected award
12/16/2026
Duration
12 months

Last updated

Details

Type
Request for Proposal
Industry
Engineering Services
NAICS
541330
Solicitation №
08-183

Budget estimate

$300,000 – $600,000

Based on typical municipal engineering studies of this complexity (two wastewater plants, multiple alternatives, data collection, and optional 10 % design), the contract value is likely in the mid‑hundreds of thousands. Assuming a senior engineer rate of $150‑$200/hr, a junior staff rate of $90‑$120/hr, and total effort of roughly 1,500‑2,500 hours (including management, analysis, reporting, and optional design), the estimated fee range would be approximately $300,000 to $600,000. Factors influencing the final amount include the optional 10 % design scope, any required sub‑consultants, and the depth of data collection required.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Colwich·Kansas

Top match · 69%

Colwich Wastewater Treatment Plant Improvements

Closes 10/14/2026Opened 9/22/2026

City of Salisbury·Maryland

67% match

Park Water Treatment Plant PFAS Study 1

Closes 10/20/2026Opened 9/18/2026

City of Huron·Kansas

67% match

Wastewater Treatment Facility (WWTF) Improvements - Huron, KS

Closes 10/29/2026Opened 9/28/2026

City of Middletown·Ohio

66% match

Water Reclamation Facility Secondary Aeration Improvements

Closes 10/13/2026Opened 9/1/2026

City of Charlotte·North Carolina

66% match

Service Water Improvements and Flow Meter Modifications

Rolling / TBD closeOpened 1/31/2026

City of Bakersfield·California

66% match

WASTEWATER TREATMENT PLANTS NO.2 AND 3 SEPTAGE RECEIVING STATION IMPROVEMENTS

Closes 10/29/2026Opened 10/1/2026

Town of Front Royal·Virginia

66% match

Wastewater Treatment Plant Centrifuge Facility

Closes 10/16/2026Opened 9/9/2026

Upper Occoquan Service Authority·Virginia

66% match

UOSA IFB 27-02 P2NR+ Construction

Closes 10/22/2026Opened 8/24/2026

City of Bismarck·North Dakota

66% match

Wastewater Treatment Plant Polymer IFB

Closes 11/3/2026Opened 8/11/2026

City of Madison·Wisconsin

66% match

PFAS Testing of Wastewater and Biosolids Consultant

Closes 10/30/2026Opened 10/6/2026

City of Austin·Texas

66% match

Davis Water Treatment Plant Filter System Improvements

Rolling / TBD closeOpened 10/2/2026

U.S. Environmental Protection Agency·United States of America

65% match

R--Technical Support for Drinking Water Optimization Program

Closes 10/26/2026Opened 10/9/2026

City of Franklin·Tennessee

65% match

Wastewater Treatment Laboratory Services for the City of Franklin, TN Water Management Department

Closes 10/29/2026Opened 10/8/2026

City of Douglas·Wyoming

65% match

Sanitary Sewer and Misc. WWTP Improvements Project

Closes 11/3/2026Opened 10/7/2026

City of Bakersfield·California

65% match

RFP/Q - WWTP No. 2 and WWTP No.3 Phase 0 Projects

Closes 11/19/2026Opened 10/9/2026

Georgia City of Atlanta·Georgia

65% match

MS-IFB/DWM/2608-1270042, Chattahoochee Water Treatment Plant SCADA Improvements

Closes 10/14/2026Opened 9/30/2026

City of Charlotte·North Carolina

65% match

McDowell Creek Wastewater Treatment Plant Clarifier & Pumping Station

Rolling / TBD closeOpened 1/1/2027

Maryland City of Salisbury·Maryland

65% match

Park Water Treatment Plant PFAS Study 1

Closes 10/20/2026Opened 9/19/2026

Iowa Dept Of Natural Resources·Iowa

65% match

Wastewater Improvements, Lacey-Keosauqua State Park, Van Buren County

Closes 10/22/2026Opened 9/30/2026

City of Austin·Texas

65% match

Pino Lane Wastewater Improvements

Rolling / TBD closeOpened 8/10/2026

City of Charlotte·North Carolina

65% match

McDowell WWTP UV Disinfection Improvements

Rolling / TBD closeOpened 2/1/2027

City of Franklin·Tennessee

64% match

Wastewater Treatment Laboratory Services

Closes 10/29/2026Opened 10/8/2026

Florida Department of Corrections (FDC)·Florida

64% match

Laboratory Analysis on Water Treatment Plants, Wastewater Treatment Plants, and Groundwater Monitor

Closes 8/30/2027Opened 9/30/2026

Dickenson County·Virginia

64% match

Dickenson County Public Service Authority Haysi Wastewater Treatment Plant

Closes 11/16/2026Opened 9/30/2026

City of Austin·Texas

64% match

Hornsby Bend Biosolids Management Plant Headworks Improvemen

Rolling / TBD closeOpened 6/15/2026