Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • Georgia guideGeorgia Bids and Bidding Guide
  • Compliance checkHow to Ensure RFP Compliance
  • How to answer an RFPChoosing and Responding to Government Bids
More engineering services bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Georgia
  4. ›Engineering Services
  5. ›Snapfinger Advanced Wastewater Treatment Facility…

County of DeKalb, GA·Georgia

Snapfinger Advanced Wastewater Treatment Facility Expansion - Phase 3E - Design and Engineering Services During Construction

Closes 1/20/2027$5M – $15MRequest for Proposal
Get bids like this by emailBid source

Description

The County of DeKalb, GA is seeking qualified engineering firms to provide comprehensive design and engineering services for Phase 3E of the Snapfinger Advanced Wastewater Treatment Facility expansion. The scope includes alternative‑evaluation design, permitting, construction‑phase engineering, and post‑construction services for adding a primary clarification unit and replacing dewatering centrifuges. Work must commence within ten days of a Notice to Proceed and be completed within 3,014 days. The contract follows a design‑bid‑build delivery method and requires at least 50 % of the work to be self‑performed by the prime. Mandatory participation in LSBE meetings, a pre‑proposal meeting, and a site visit is required. • Project location: Snapfinger Advanced Wastewater Treatment Facility, Decatur, GA • Services: Preliminary design, Basis of Design, Design Development, construction‑phase engineering, permit applications, and post‑construction commissioning • Timeline: Advertised Oct 19 2026; Questions due Dec 4 2026; Site visit & pre‑proposal meeting Nov 16 2026; Proposal deadline Jan 20 2027; Design work to be completed within ~8 years • Mandatory meetings: LSBE (Oct 21, Oct 28, Nov 18, Dec 2 2026), Pre‑Proposal (Nov 16 2026), Site Visit (Nov 16 2026) • Required qualifications: Minimum three similar wastewater projects ≥15 MGD capacity, each ≥$25 M, with a professional engineer licensed in GA.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Njeri Thorpe(Procurement Agent)

[email protected]

(404) 687-3553

Key dates

Opened
10/19/2026
Questions due
12/4/2026
Pre-bid meeting
11/16/2026Mandatory
Site visit
11/16/2026Mandatory
Closes
1/20/2027
Duration
3014 days

Last updated

Details

Type
Request for Proposal
Industry
Engineering Services
NAICS
541330
Solicitation №
2026-135-RFP

Budget estimate

$5,000,000 – $15,000,000

The RFP does not disclose a contract value. Similar large‑scale wastewater design‑bid‑build contracts in the southeastern U.S. typically range from $5 million to $15 million, depending on scope complexity, design duration, and required permitting. Given the extensive design period (up to 8 years) and the need for both preliminary and detailed design, construction‑phase engineering, and post‑construction services, a reasonable ballpark estimate would be between $5 M and $15 M. Factors influencing the final amount include the final design depth, any unforeseen site conditions, and the level of self‑performance required.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Georgia DeKalb County Government·Georgia

Top match · 96%

2026-135-RFP Snapfinger AWTF Expansion [Phase 3E] Design & Engineering Services During Construction

Closes 1/20/2027Opened 10/19/2026

Cobb County, GA·Georgia

85% match

Master Task Order Contracting 2027-2029: Water and Wastewater Facilities Services

Closes 10/22/2026Opened 10/2/2026

Fort Pierce Utilities Authority·Florida

84% match

Water & Wastewater Systems Continuing Design-Build Services

Closes 11/2/2026Opened 10/6/2026

Georgia Cobb County·Georgia

84% match

Master Task Order Contracting 2027-2029: Water and Wastewater Facilities Services

Closes 10/22/2026Opened 9/24/2026

County of DeKalb, GA·Georgia

83% match

Snapfinger Woods Sidewalk Construction with Pedestrian Hybrid Beacon (12 Months)

Closes 11/12/2026Opened 9/28/2026

Sun 'n Lake Improvement District·Florida

83% match

Wastewater Treatment Plant Progressive Design-Build Services

Closes 11/20/2026Opened 10/19/2026

Georgia Cobb County Department of Transportation·Georgia

82% match

Engineering Design Services for Factory Shoals Pedestrian Bridge Phase 1

Closes 11/12/2026Opened 10/16/2026

Fort Bend County Municipal Utility District No. 219C·Texas

82% match

Wastewater Treatment Plant No. 1 -Phase 1 (0.15 MGD) Lease to serve Fort Bend County Municipal Utility District No. 219c

Closes 11/3/2026Opened 10/16/2026

Gwinnett County Government·Georgia

81% match

Provision of Grounds Maintenance at Department of Water Resources Facilities on an Annual Contract

Closes 10/21/2026Opened 9/23/2026

Town of Narragansett·Rhode Island

81% match

Professional Engineering Services for Wastewater Projects

Closes 10/20/2026Opened 10/20/2026

Georgia Brunswick‑Glynn County Joint Water & Sewer Commission·Georgia

81% match

JWSC RFP 27-002 Progressive Design-Build Services for N Mainland WPCF Construction and Commissioning

Closes 10/29/2026Opened 9/25/2026

Georgia DeKalb County Government·Georgia

81% match

2026-109-ITB Snapfinger Woods Sidewalk Construction with PHB (12 Months)

Closes 11/12/2026Opened 9/28/2026

City of Richmond·Virginia

81% match

Wastewater Annual Engineering Services

Closes 10/30/2026Opened 9/30/2026

Georgia Gwinnett County Government·Georgia

81% match

BL139-26 Provision of Grounds Maintenance at Department of Water Resources Facilities on an Annual C

Closes 11/2/2026Opened 9/24/2026

Georgia City of Hephzibah·Georgia

80% match

Addition to Existing Water Pollution Control Plan

Closes 11/5/2026Opened 9/28/2026

City of Roseville·California

80% match

Construction Services: DCWWTP Primary Sedimentation Basin Rehabilitation Project

Closes 10/27/2026Opened 8/25/2026

Charles County Government·Maryland

80% match

MWWTP Effluent FM Surge & Transient Design Build Services (UN 1282)

Closes 11/2/2026Opened 7/8/2026

Fort Pierce Utilities Authority·Florida

80% match

Continuing Contract for Water & Wastewater Systems Construction and/or Program Management Service ("Project Management")

Closes 11/2/2026Opened 10/6/2026

Erie County·New York

80% match

ERIE COUNTY SEWER DISTRICT NO. 3 SOUTHTOWNS ADVANCED WASTEWATER TREATMENT FACILITY PHASE 2 EXPANTION CONTRACT NO. 75

Closes 11/19/2026Opened 9/22/2026

Maryland City of Baltimore·Maryland

80% match

PROJECT NO. 1407 WASTEWATER COLLECTION SYSTEM PROGRAM MANAGEMENT

Closes 11/19/2026Opened 9/18/2026

Town of Narragansett·Rhode Island

80% match

Professional Engineering Services for Wastewater Projects

Closes 10/20/2026Opened 9/25/2026

Pittsylvania County·Virginia

80% match

RFP# 20261014 Hurt Water Treatment Plant

Closes 11/12/2026Opened 10/14/2026

Gwinnett County Government·Georgia

80% match

Provision of Grounds Maintenance at Department of Water Resources Facilities on an Annual Contract

Closes 11/2/2026Opened 9/23/2026

City of Palm Springs·California

80% match

PALM SPRINGS WASTEWATER TREATMENT PLANT ODOR CONTROL IMPROVEMENTS

Closes 11/9/2026Opened 10/13/2026

Fort Pierce Utilities Authority·Florida

80% match

Gas Operations Continuing Design-Build Services

Closes 11/5/2026Opened 10/9/2026