Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Iowa guideIowa Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Iowa
  4. ›Closed bids
  5. ›Union Station Flood Repairs Project

City of Davenport·Iowa

Union Station Flood Repairs Project

Closes 9/24/2026$2M – $5MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Davenport is soliciting bids for the Union Station Flood Repairs Project, a civil‑engineering effort to protect the historic Union Station area from future flooding. The scope includes design‑build construction of an earthen berm with a sheet‑pile wall, a free‑standing flood wall, a removable flood gate, PCC paving, a new storm‑sewer system, topsoil, sodding, landscaping, and erosion‑control measures. The contractor must supply all labor, materials, equipment, surveying, and site‑management services, adhere to strict traffic‑control and utility‑coordination requirements, and complete the work within a 45‑calendar‑day window (excluding the winter shutdown period). The contract provides for monthly progress payments with a 3 % retainage and liquidated damages of $500 per day for late completion.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Tom Linehan

(563) 888-2077

Key dates

Opened
9/3/2026
Questions due
9/15/2026
Closes
9/24/2026
Projected award
10/14/2026
Duration
45 days

Last updated

Details

Type
Invitation for Bid
Industry
Civil Engineering
NAICS
237990
Solicitation №
27-21

Budget estimate

$2,000,000 – $5,000,000

Based on the extensive scope—earthen berm, sheet‑pile and flood wall, removable gate, PCC paving, new storm‑sewer, landscaping, and associated traffic‑control and permitting—similar municipal flood‑mitigation projects in the Midwest typically range from $2 million to $5 million in contract value. The estimate accounts for material costs (concrete, steel sheet piles, pipe), labor for a 45‑day schedule, equipment rentals, permits, and the required retainage. Variations could arise from site‑specific soil conditions, utility relocation complexity, or unforeseen weather delays, which would shift the final amount within this band.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Worcester·Massachusetts

Top match · 72%

Waterproofing & Repairs – Union Station Garage / DPF-FTA

Closes 11/4/2026Opened 10/1/2026

City of Coronado·California

72% match

First Street Stormwater Pump Station Flood Relief Project

Closes 11/9/2026Opened 9/23/2026

Union Parish School Board·Louisiana

71% match

UNION PARISH HIGH SCHOOL 2026 WINTER STORM DAMAGE REPAIRS

Closes 11/10/2026Opened 10/8/2026

U.S. Department Of Defense·Texas

70% match

Mary Rhodes Pump Station: Emergency Streambank Erosion Protection

Closes 10/13/2026Opened 10/1/2026

City of Charlotte·North Carolina

68% match

CTC Drainage Repairs

Rolling / TBD closeOpened 1/20/2026

City of Charlotte·North Carolina

68% match

Elevated Water Tank Rehabilitation

Rolling / TBD closeOpened 1/12/2027

U.S. Department Of Defense·Texas

68% match

Mary Rhodes Pump Station: Emergency Streambank Erosion Protection

Closes 10/13/2026Opened 10/1/2026

City of Charlotte·North Carolina

68% match

Newell Stream Restoration Project

Rolling / TBD closeOpened 7/15/2026

City of Charlotte·North Carolina

68% match

Camp Greene/Freedom Drive Storm Drainage Improvement Project

Rolling / TBD closeOpened 12/15/2028

City of Worcester·Massachusetts

68% match

Sprinkler & Fire Alarm Modifications - Phase II - Union Station / WRA

Closes 10/28/2026Opened 9/17/2026

City of Charlotte·North Carolina

68% match

Hill Street Storm Drainage Improvement Project

Rolling / TBD closeOpened 8/15/2027

City of Roseville·California

68% match

Construction Services: DCWWTP Primary Sedimentation Basin Rehabilitation Project

Closes 10/27/2026Opened 8/25/2026

City of Worcester·Massachusetts

68% match

Generator Replacement - Union Station / WRA

Closes 10/28/2026Opened 9/21/2026

City of Charlotte·North Carolina

68% match

Valleybrook Storm Drainage Improvement Project

Rolling / TBD closeOpened 5/15/2027

City of Charlotte·North Carolina

68% match

Pella Rd 6212 Project Storm Drainage Improvement Project

Rolling / TBD closeOpened 7/4/2026

City of Charlotte·North Carolina

68% match

Log Cabin 937 Storm Drainage Improvement Project

Rolling / TBD closeOpened 12/15/2027

City of St. Louis Board of Public Service·Missouri

67% match

Union Lindell Bridge Replacement

Closes 10/20/2026Opened 9/16/2026

City of Montpelier·Vermont

67% match

FLOOD RECONSTRUCTION AND MITIGATION ARCHITECTURAL AND ENGINEERING SERVICES

Closes 10/23/2026Opened 9/18/2026

NYS OGS Design & Construction - Construction Contractors·New York

67% match

Refurbish Boiler Plant & Replace Feedwater System – Project M3215‑H/E

Closes 10/14/2026Opened 8/21/2026

City of Montpelier·Vermont

67% match

CITY HALL, FIRE DEPARTMENT, & POLICE STATION FLOOD RECONSTRUCTION AND MITIGATION ARCHITECTURAL AND E

Closes 10/23/2026Opened 9/18/2026

Upper Occoquan Service Authority·Virginia

67% match

UOSA IFB 27-02 P2NR+ Construction

Closes 10/22/2026Opened 8/24/2026

League City·Texas

67% match

Landing Blvd Lift Station Rehab WW1901F

Closes 11/3/2026Opened 10/2/2026

City of Charlotte·North Carolina

67% match

Piccadilly Storm Drainage Improvement Project

Rolling / TBD closeOpened 10/15/2027

City of Charlotte·North Carolina

67% match

Collective AG Storm Water Drainage Improvement Project

Rolling / TBD closeOpened 3/15/2026

Sterling Heights·Michigan

67% match

NORTH VAN DYKE AVENUE CORRIDOR IMPROVEMENTS & STORMWATER RESILIENCE PLANNING

Closes 10/13/2026Opened 9/30/2026