Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • Washington guideWashington Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Washington
  4. ›Construction
  5. ›Colville Fuels, Coyote Ridge Golf Course, Secondary…

Confederated Tribes of the Colville Reservation·Washington

Colville Fuels, Coyote Ridge Golf Course, Secondary Emergency Exit from Clubhouse Basement

Closes 11/20/2026$150k – $500kInvitation for Bid
Get bids like this by emailBid source

Description

The Confederated Tribes of the Colville Reservation, through its wholly‑owned entity Colville Fuels LLC, is seeking qualified contractors to design and construct a code‑compliant secondary emergency exit from the basement of the clubhouse at Coyote Ridge Golf Course in Electric City, WA. The scope includes site investigation, demolition of part of an existing concrete wall, installation of a commercial‑grade insulated steel door with panic hardware, excavation for an exterior egress path, construction of retaining walls and ADA‑accessible ramp, drainage improvements, guardrails/handrails, and full interior and exterior restoration. Bids must be submitted by 4 PM PST on 20 Nov 2026; the award is expected on 4 Dec 2026 with construction to be completed by early 2027. • Concrete wall modification and shoring, with structural engineering for new openings. • Installation of a commercial‑grade insulated steel door with self‑closing and panic hardware. • Excavation, retaining wall construction, and ADA‑compliant ramp/egress path to sidewalk/grade. • Drainage, weather‑proofing, guardrails/handrails, and full site/finish restoration. • Contractor must meet insurance minimums, provide Indian Preference documentation, and submit a lump‑sum price.

Attached files

Contact

Ryan Moses(Facilities Senior Manager)

[email protected]

(509) 846-9243

Key dates

Opened
10/19/2026
Closes
11/20/2026
Projected award
12/4/2026
Duration
4 months

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
236220

Budget estimate

$150,000 – $500,000

The solicitation does not disclose a contract ceiling, but the described scope (structural concrete modifications, ADA ramp, door installation, extensive site work, and finish restoration) typically falls in the low‑to‑mid‑six‑figure range for similar municipal/tribal projects in Washington. Estimating $150 k for a minimal design‑build approach and up to $500 k for a fully engineered solution with high‑grade materials yields a reasonable expectation. Factors influencing the final amount include the complexity of the retaining wall, local labor rates, material choices for the door and drainage system, and any unforeseen site conditions discovered during investigation.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Confederated Tribes of the Colville Reservation·Washington

Top match · 82%

Environmental Trust, Comprehensive Emergency Management Plan Update & Environmental Engineering and Consulting Services

Closes 11/5/2026Opened 10/19/2026

Cherokee Nation·Oklahoma

82% match

Cherokee Springs Golf Course- New Shop Building

Closes 11/6/2026Opened 10/14/2026

Villages Community Development Districts, FL·Florida

81% match

Executive Golf Course Renovation Projects – Various Locations

Closes 11/3/2026Opened 10/9/2026

Confederated Tribes of the Colville Reservation·Washington

81% match

Environmental Trust Department, Owhi Flats 2026

Closes 10/29/2026Opened 10/15/2026

Massachusetts Town of Holliston·Massachusetts

81% match

Pinecrest Rock Formation Restoration

Closes 10/30/2026Opened 10/6/2026

Confederated Tribes of the Colville Reservation·Washington

80% match

San Poil Forest, Louie Creek

Closes 11/5/2026Opened 10/19/2026

Confederated Tribes of the Colville Reservation·Washington

80% match

Traditional Territories Program, Concrete Slab Construction – Omak Fish and Wildlife Bullpen (Saint Mary’s Mission Campus)

Closes 11/26/2026Opened 10/23/2026

Confederated Tribes of the Colville Reservation·Washington

80% match

San Poil Forest, Louie Creek

Closes 11/5/2026Opened 10/19/2026

Confederated Tribes of the Colville Reservation·Washington

80% match

Environmental Trust Department, Owhi Flats 2026

Closes 10/29/2026Opened 10/15/2026

Confederated Tribes of the Colville Reservation·Washington

80% match

Keller Community Center Roof Replacement Engineering & Design

Closes 10/29/2026Opened 10/1/2026

Massachusetts Town of Brewster·Massachusetts

80% match

Construction of Golf Maintenance Building

Closes 10/29/2026Opened 9/16/2026

Confederated Tribes of the Colville Reservation·Washington

80% match

Environmental Trust, Comprehensive Emergency Management Plan Update & Environmental Engineering and Consulting Services

Closes 11/5/2026Opened 10/19/2026

Imperial Irrigation District·California

79% match

Clubhouse Bale Expansion Project

Closes 11/3/2026Opened 9/22/2026

U.S. Department Of Agriculture·Colorado

79% match

Stove Prairie Campground Gate Replacement

Closes 11/11/2026Opened 10/20/2026

Confederated Tribes of the Colville Reservation·Washington

79% match

Keller Community Center Roof Replacement Engineering & Design

Closes 10/29/2026Opened 10/1/2026

Confederated Tribes of the Colville Reservation·Washington

79% match

San Poil Forest stocking Survey 2027

Closes 10/25/2026Opened 10/6/2026

Brazos Valley·Texas

79% match

Construction of New Columbarium at Aggie Field of Honor

Closes 10/27/2026Opened 9/23/2026

County of Greenwood, SC·South Carolina

79% match

Greenwood County Recreation Center Baseball Fence

Closes 11/12/2026Opened 10/1/2026

Confederated Tribes of the Colville Reservation·Washington

79% match

IT, Lot Cleanup, Vegetation Control, Debris Removal, and Metal Product Decommissioning and Removing

Closes 10/29/2026Opened 10/15/2026

U.S. Department Of Agriculture·Idaho

79% match

Big Springs Horse Corral Replacement

Closes 10/29/2026Opened 10/15/2026

U.S. Department Of Defense·California

79% match

Monterey Golf Range Technology

Closes 11/10/2026Opened 10/7/2026

Cascade County·Montana

79% match

Construction of the Evans-Riceville Road Repair

Closes 10/27/2026Opened 10/9/2026

State of Tennessee·Tennessee

79% match

Chickasaw State Park Stem Repair

Closes 10/22/2026Opened 10/7/2026

Connecticut Town of Bloomfield·Connecticut

78% match

RFP 1175 Wintonbury Hill Golf Course - Bunker, Green & Tee Renovations

Closes 11/5/2026Opened 10/6/2026

Nevada Government·Nevada

78% match

Carson City Centennial Park Drainage Project

Closes 10/22/2026Opened 9/30/2026