Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • Iowa guideIowa Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Iowa
  4. ›Construction
  5. ›8th Avenue Bridge Replacement and Floodwalls at Cedar River

City of Cedar Rapids·Iowa

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes in 6 days$100M – $150MInvitation for Bid
Get bids like this by emailBid source

Description

The City of Cedar Rapids is soliciting bids for the complete replacement of the 8th Avenue bridge over the Cedar River and associated flood‑control improvements. The scope includes demolition of the existing bridge, construction of a new cable‑stayed bridge, installation of integral floodwalls, approach roadways, sidewalks, trail reconstruction, utility relocation, lighting, traffic signalization, and related site work. The Engineer’s probable cost is $123 million, with an anticipated start after notice to proceed in Jan/Feb 2027 and a contract duration of roughly 1,250 calendar days. Bidders must submit a bid bond, bidder status form, and comply with extensive civil, structural, and environmental specifications. A pre‑bid conference is scheduled for 2 pm on 14 Sept 2026 (in‑person and via Teams). • New cable‑stayed river bridge and floodwall system • Demolition of existing bridge and related structures • Roadway, sidewalk, trail, and utility reconstruction • Traffic signal and lighting upgrades • Extensive civil‑engineering specifications (SUDAS, city supplemental specs) • Estimated construction cost $123 M; start Jan/Feb 2027, 1,250‑day duration • Mandatory bid bond and bidder status form submission • Pre‑bid conference 14 Sept 2026 (attendance encouraged, not required) • Questions due 29 Oct 2026; bid deadline 4 Nov 2026

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Key dates

Opened
8/26/2026
Questions due
10/29/2026
Pre-bid meeting
9/14/2026
Closes
11/4/2026
Duration
1250 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
3318551-01 Addendum 6

Budget estimate

$100,000,000 – $150,000,000

The Engineer’s probable cost is listed as $123 million, which typically reflects the total contract value for a public‑sector bridge and floodwall project of this magnitude. Accounting for contingencies, design changes, and inflation, the final budget to the winning contractor is likely to fall within a range of roughly $100 million to $150 million. Factors influencing the final amount include the exact quantities of earthwork, steel, and utility relocations, as well as any change‑order adjustments during the 1,250‑day construction period.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Cedar Rapids·Iowa

Top match · 99%

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

City of Cedar Rapids·Iowa

99% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

City of Cedar Rapids·Iowa

99% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

City of Cedar Rapids·Iowa

99% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

City of Cedar Rapids·Iowa

99% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

City of Cedar Rapids·Iowa

98% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

City of Cedar Rapids·Iowa

90% match

Ellis Blvd NW Levee and Floodwall Improvements

Closes 11/18/2026Opened 10/21/2026

City of Cedar Rapids·Iowa

89% match

8th Ave Bridge Replacement & Floodwalls Construction Engineering & Inspection Services

Closes 11/10/2026Opened 10/20/2026

City of Cedar Rapids·Iowa

86% match

Kirkwood Boulevard SW from Rolling Ridge Drive to 66th Avenue Rehabilitation

Closes 11/4/2026Opened 10/21/2026

City of Cedar Rapids·Iowa

86% match

34th Street SE from North of Terry Drive to Cottage Grove Avenue

Closes 11/18/2026Opened 10/21/2026

City of Palm Springs·California

83% match

East Palm Canyon Bridge Project

Closes 11/20/2026Opened 10/20/2026

City of St. Louis Board of Public Service·Missouri

83% match

Union Lindell Bridge Replacement

Closes 11/3/2026Opened 9/16/2026

U.S. Department Of Defense·Oregon

83% match

Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement

Closes 10/29/2026Opened 7/6/2026

City of St. Louis Board of Public Service·Missouri

82% match

Removal & Replacement of Southwest & Columbia Bridges

Closes 11/10/2026Opened 10/7/2026

City of High Point·North Carolina

82% match

Bid 09-110426 Bridges Preservation Project

Closes 11/4/2026Opened 10/2/2026

U.S. Department Of Defense·Oregon

82% match

Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement

Closes 10/29/2026Opened 10/1/2026

NYS OGS Design & Construction - Construction Contractors·New York

82% match

Rehabilitate Floodwalls – Project 46196‑C (Cheektowaga, NY)

Closes 11/18/2026Opened 10/13/2026

City of Creve Coeur·Missouri

82% match

Malcolm Terrace Park Bridge and Deer Creek Stabilization

Closes 11/12/2026Opened 10/22/2026

Ohio Department of Natural Resources·Ohio

82% match

Lake Logan Dam Improvements

Closes 11/6/2026Opened 10/16/2026

City of Alexandria·Louisiana

82% match

Masonic Drive Sidewalk - Hynson Bayou Pedestrian Bridge Replacement

Closes 12/1/2026Opened 10/23/2026

City of Cedar Rapids·Iowa

82% match

Cedar Lake Amenities Bid Package 3B: Recreational Amenities

Closes 11/18/2026Opened 10/22/2026

Georgia Cobb County Department of Transportation·Georgia

82% match

Engineering Design Services for Factory Shoals Pedestrian Bridge Phase 1

Closes 11/12/2026Opened 10/16/2026

Town of Clinton·Connecticut

81% match

Replacement of Bridge No. 06956, Country Village Lane

Closes 11/4/2026Opened 10/7/2026

Town of Pulaski·Virginia

81% match

PROPOSED BRIDGE SUPERSTRUCTURE REPLACEMENT WEST COMMERCE STREET OVER PEAK CREEK

Closes 12/16/2026Opened 9/25/2026