The City of Cincinnati is soliciting bids for the design, supply, installation, and commissioning of electric vehicle (EV) DC fast‑charging stations at three recreation centers (Madisonville, Hartwell, and Price Hill). The contract includes all civil, electrical, and site‑work required to install the chargers, perform load calculations, coordinate with Duke Energy, and provide one‑year warranty and maintenance. The contractor must be pre‑qualified by ODOT, register in the City’s Vendor Self‑Service system, and submit a bid bond of at least 10 % of the total bid. Work must start within five days of award notice and be completed within 90 days of start, with an anticipated start date of March 1 2027. • Install DC fast‑charging equipment (minimum 1 charger per site, optional alternates for a second charger). • Perform site reconnaissance (pre‑bid meeting on 10/21/2026). • Provide all required permits, inspections, and compliance with ODOT and City specifications. • Deliver performance and payment bonds, insurance, and adhere to Davis‑Bacon wage rates. • No small‑business (SBE) goal; 0 % SBE participation required.
You found this one. Bid Banana has 1.6M+ bids and awards.
You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.