The City of Roseville is seeking qualified electrical contractors to provide comprehensive electrical maintenance services for its two gas‑fired power‑generation facilities (Roseville Energy Park – 165 MW combined‑cycle plus 66 MW simple‑cycle, and Roseville Sunset Energy Center – 66 MW simple‑cycle). The contract will be awarded through a competitive negotiation process and will run for an initial five‑year term with a “Not‑To‑Exceed” ceiling. A mandatory on‑site pre‑proposal conference and job walk is required on 10 Nov 2026; attendance is compulsory. Proposals must be submitted by 3 PM on 16 Dec 2026. The scope includes inspection, testing, troubleshooting, repair, and replacement of all electrical equipment, provision of qualified personnel, tools, PPE, and compliance with safety regulations. The City will evaluate experience, project understanding, and cost.
• Mandatory pre‑bid conference & job walk – 10 Nov 2026 (attendance required)
• Contract length – 5 years, with possible renegotiation of rates
• Services – full‑cycle electrical maintenance for gas turbines, HRSGs, cooling tower, crystallizers, sumps, tanks, etc.
• Submission deadline – 16 Dec 2026, 3 PM (hard‑copy or email)
• Evaluation criteria – experience/qualifications, project understanding, cost proposal
• Primary contact – Marian Naguib, (916) 774‑5689,
[email protected]