The City of Pinole is seeking a qualified engineering/consulting firm to produce construction‑ready (shovel‑ready) designs for Level II dual‑port electric vehicle charging stations at six municipal sites (City Hall, Senior Center, Bayfront Park, Swimming Pool, Meadow Park, and Louis Francis Park). The work includes site assessments, recommendation reports, detailed electrical and civil design packages, permitting‑ready drawings, and coordination with federal, state, and local grant requirements (MTC, BAAQMD). Deliverables must be finalized by December 18 2026, after which the City will award a fixed‑fee contract to begin implementation.
• Six EVSE design packages (7 chargers at City Hall, 3 at Senior Center, 9 at Bayfront Park, 6 at Swimming Pool, up to 4 shared between Meadow and Louis Francis Parks).
• Tasks: site assessment, recommendation memo, design development (electrical, civil, ADA, striping, metering, compliance with 2025 CA Building Code).
• Must incorporate existing preliminary engineering from Marin Clean Energy, PG&E, and Caltrans, and adhere to 2 CFR Part 200, Build America/Buy America, and PG&E Rule 29.
• Fixed‑fee proposal, hourly‑rate breakdown required; final designs due 12/18/2026.
• Funding: Federal MTC grant, BAAQMD grant, and possibly other state sources.