Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • New Hampshire guideNew Hampshire Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFPChoosing and Responding to Government Bids
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›New Hampshire
  4. ›Closed bids
  5. ›National Electric Vehicle Infrastructure (NEVI) - Phase II

New Hampshire Department of Transportation·New Hampshire

National Electric Vehicle Infrastructure (NEVI) - Phase II

Closes 8/21/2026$10M – $12MRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The New Hampshire Department of Transportation is seeking a qualified developer to design, install, and operate up to six public DC fast‑charging stations (NEVI Phase II) that meet federal NEVI Formula Program standards. Each site must provide at least four 150 kW DCFC units with both CCS and NACS connectors, be 24/7 accessible, achieve ≥ 97 % uptime, and include full O&M services for five years. The project is funded primarily with $9.6 M of NEVI federal dollars (up to 80 % of eligible costs) and requires a minimum 20 % non‑federal match. The contract will cover design, permitting, construction, commissioning, and a five‑year operations and maintenance period, with performance‑based milestone payments and a 10 % withholding released over the O&M term. • Install minimum four 150 kW DC fast‑charging ports per site (CCS + NACS) with 24/7 public access. • Provide full design, utility coordination, permitting, construction, testing, and five‑year O&M, meeting ≥ 97 % uptime. • Funding: up to $12 M total (≈ $9.6 M NEVI grant + ≥ 20 % sponsor match); milestone payments tied to design sign‑off, equipment procurement, final acceptance, and annual performance.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Michael Mozer(Contact)

[email protected]

Key dates

Opened
6/9/2026
Questions due
7/6/2026
Closes
8/21/2026
Duration
5 years

Last updated

Details

Type
Request for Proposal
Industry
Construction
NAICS
238210
Solicitation №
RFP DOT 2027-01

Budget estimate

$10,000,000 – $12,000,000

The solicitation caps the total project budget at roughly $12 M (≈ $9.6 M federal NEVI funds plus a required ≥ 20 % sponsor match). Assuming the contractor receives the full design, construction, and five‑year O&M fees, the award could range from $10 M (if the sponsor match is low and the contractor’s fee is modest) up to $12 M (if the sponsor match is at the minimum 20 % and the contractor’s fee captures the full eligible cost). The estimate accounts for equipment procurement, civil works, electrical installation, software integration, and ongoing maintenance staffing.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

New Jersey Department of Transportation Procurement·New Jersey

Top match · 76%

National Electric Vehicle Infrastructure – North (NEVI‑North) – Design‑Build Request for Proposals

Closes 10/28/2026Opened 9/16/2026

Wyoming Department of Transportation·Wyoming

74% match

NATIONAL ELECTRIC VEHICLE INFASTRUCTURE PROGRAM

Closes 11/18/2026Opened 9/23/2026

New Jersey Department of Transportation Procurement·New Jersey

74% match

National Electric Vehicle Infrastructure – South (NEVI) – Design‑Build Contract (DB‑004)

Closes 10/28/2026Opened 9/17/2026

California Energy Commission·California

70% match

GFO-25-603 - California’s National Electric Vehicle Infrastructure Formula Program – Solicitation 6 Community Charging

Closes 11/20/2026Opened 2/23/2026

Public Service Company of New Mexico·New Mexico

70% match

RFI: Transportation Electrification Program (TEP)

Closes 11/6/2026Opened 9/1/2026

NYS Rockland County·New York

67% match

ELECTRIC VEHICLE CHARGING INFRASTRUCTURE STUDY

Closes 10/29/2026Opened 9/22/2026

U.S. Virgin Islands GVIBUY·U.S. Virgin Islands

67% match

Engineer and Construct a Renewably Powered Battery-Coupled DC Fast Charging Network for the GVI, USV

Closes 11/5/2026Opened 10/7/2026

City of East Providence·Rhode Island

65% match

Purchase & installation of Electric Vehicle Charging Stations

Closes 10/21/2026Opened 9/30/2026

City of Charlotte·North Carolina

64% match

Nevin Rd and W Sugar Creek Rd ITS

Rolling / TBD closeOpened 1/1/2027

Nevada Government·Nevada

64% match

Apex Elevated Water Tank Power

Closes 10/22/2026Opened 10/7/2026

Connecticut City of Norwalk·Connecticut

64% match

Norwalk City Hall EV Station Project

Closes 10/27/2026Opened 10/13/2026

Massachusetts Department of Transportation·Massachusetts

64% match

613689 CAMBRIDGE FAP No. HPP/STP-003E(014)X Neighborhood Electric Vehicle Charging Infrastructure

Closes 11/10/2026Opened 9/14/2026

New York City Department of Transportation·New York

64% match

84127Y0885 – Request for Information (RFI) Regarding Electric Vehicle Charging Incentive Program

Closes 10/14/2026Opened 9/14/2026

NYSERDA·New York

64% match

Grid Modernization Utility Challenge – National Grid

Closes 11/10/2026Opened 10/8/2026

City of Pasadena·California

64% match

Playhouse Park EV Chargers Phase II Construction Project

Closes 10/14/2026Opened 9/8/2026

National Aeronautics And Space Administration·California

63% match

Spacecraft Electrical Power Systems (Pre-RFI Market Research)

Closes 10/30/2026Opened 10/6/2026

New York City Department of Transportation·New York

63% match

Request for Information (RFI) Regarding Electric Vehicle Charging Incentive Program

Closes 11/30/2026Opened 9/14/2026

Georgia City of Albany·Georgia

63% match

27-023 Viper Switch Installation Phase 2

Closes 10/14/2026Opened 9/14/2026

New York State Energy Research and Development Authority·New York

63% match

Grid Modernization Utility Challenge – National Grid

Closes 11/10/2026Opened 10/8/2026

Navajo Tribal Utility Authority·Arizona

63% match

SOLAR UNDERGROUND ELECTRICAL PROJECT

Closes 10/15/2026Opened 10/2/2026

County of Hawaii·Hawaii

63% match

MASS TRANSIT FACILITY IMPROVEMENTS

Closes 11/5/2026Opened 9/28/2026