The City of Keene, New Hampshire, is seeking a qualified consulting firm to provide a five‑year, multi‑project, qualifications‑based selection of airport architectural, engineering, environmental, planning, surveying, and construction‑administration services for Dillant‑Hopkins Airport (EEN). The consultant will be awarded individual project contracts on a “as‑needed” basis, with no guaranteed minimum fee, and will be responsible for everything from storm‑water plan updates to terminal rehabilitation, obstruction studies and removals, pavement maintenance, lighting upgrades, equipment procurement, and a potential master‑plan update. Selections will be made solely on qualifications; pricing is negotiated after award. Submissions are due November 10, 2026, with a mandatory pre‑proposal Zoom meeting on October 21, 2026.
• Multi‑disciplinary airport consulting (engineering, architecture, environmental, planning, surveying, construction admin)
• Five‑year term, individual projects scoped and priced separately
• Qualification‑only selection; no fee proposals required up front
• Required deliverables: qualifications statement (≤ 25 pages), resumes, references, insurance certificate
• Pre‑bid Zoom meeting (Oct 21) – non‑mandatory but recommended
• Submission: six hard copies + electronic thumb‑drive or online portal by 4 PM, Nov 10, 2026
• Potential projects include SWPPP update, terminal rehab, obstruction studies/removals, pavement maintenance, lighting/generator upgrades, master‑plan, and various apron/airfield works.