The Municipality of Skagway is seeking a qualified engineering firm to provide full engineering and design services, NEPA environmental review, permitting, and project‑management for the Port of Skagway Industrial Dock Redevelopment Project. The work includes conceptual through 100 % construction‑ready design of a new industrial dock, fuel header, RORO ramp, mooring dolphins, access bridge, shore‑power, and related infrastructure, as well as coordination of all required federal, state, and local permits and public outreach. The contractor will act as the prime consultant, managing sub‑consultants across civil, structural, geotechnical, and environmental disciplines, and must comply with federal “Buy‑American,” Davis‑Bacon, and other grant‑related regulations.
• Scope: Complete engineering design (conceptual → 100 %), NEPA documentation, permitting, and project management for a $51.5 M port redevelopment.
• Timeline: RFP issued Sep 30 2026, proposals due Oct 30 2026, award Dec 2 2026, 100 % design due Jun 2027, contract term until Jul 31 2028.
• Requirements: Multidisciplinary engineering expertise, NEPA/environmental experience, ability to manage sub‑consultants, insurance (≥ $2 M), and adherence to “Buy‑American” and prevailing‑wage rules.