The Municipality of Anchorage is seeking a qualified design firm to serve as Engineer‑of‑Record for a new waste‑to‑energy (WTE) facility. The scope covers full‑cycle professional design services – from concept development through construction documents, permitting support, procurement assistance, and construction‑phase engineering. The contractor must integrate civil, structural, mechanical, electrical, process, and environmental disciplines, provide technical specifications for proprietary equipment, and support the owner’s procurement and commissioning activities.
• Deliver comprehensive multidisciplinary design (civil, structural, process, mechanical, electrical, control, environmental) for a municipal WTE plant.
• Produce technical performance criteria, permit‑ready documents, and detailed construction‑phase drawings.
• Support long‑lead procurement, vendor‑technical reviews, and construction‑phase engineering, including commissioning and start‑up assistance.
• Maintain project coordination with the Owner’s PMO, Construction Manager‑at‑Risk, and Operations‑at‑Risk, adhering to the municipality’s HSSE and reporting requirements.
• Submit a signed proposal (max 20 pages) by June 16 2026, with a pre‑proposal conference on May 7 2026 and questions due May 8 2026.