Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • Texas guideTexas Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Texas
  4. ›Construction
  5. ›23-04203-08 2027 Task Order Contract for Street…

City of San Antonio·Texas

23-04203-08 2027 Task Order Contract for Street Rehabilitation Package 8 – Overlay

Closes 12/1/2026$2M – $8MInvitation for Bid
Get bids like this by emailBid source

Description

The City of San Antonio is seeking qualified contractors to execute a comprehensive street‑rehabilitation task order (Package 8 – Overlay) as part of its 2027 pavement renewal program. The scope covers a wide variety of civil‑construction activities, from asphalt milling and overlay to concrete curb and sidewalk installation, as well as associated utility adjustments and final striping. This is a competitive bid process conducted through the CivCastUSA online portal; bidders must submit their proposals by the stated deadline and may attend an optional pre‑bid WebEx session for clarification. • Primary work items include asphalt milling, hot‑mix overlay, seal‑coating, and replacement of base and pavement sections. • Additional civil works: concrete curbs, sidewalks, curb ramps, retaining walls, speed humps, and driveway construction. • Ancillary services: topsoil placement, sodding, signage, pavement markings, and adjustments to existing valve, meter, and manhole infrastructure. • All work must comply with City of San Antonio specifications and any applicable state/municipal construction standards. • Bidders must be registered on CivCastUSA, possess required Texas construction licensing, bonding, and insurance, and be prepared to mobilize resources promptly after award.

Attached files

Contact

(415) 655‑0001

Key dates

Opened
10/28/2026
Pre-bid meeting
11/10/2026
Closes
12/1/2026

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
23‑04203‑08

Budget estimate

$2,000,000 – $8,000,000

No contract ceiling is disclosed, but typical municipal street‑rehabilitation packages of this size (covering multiple miles of roadway, extensive concrete work, and utility adjustments) in a major Texas city often range from a few million dollars to the high‑single‑digit millions. Assuming a mid‑size urban corridor, a reasonable estimate would be roughly $2 million at the low end to $8 million at the high end, depending on mileage, pavement thickness, and the extent of ancillary works such as curbs, sidewalks, and sodding.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Texas City of San Antonio·Texas

Top match · 96%

2027 Task Order Contract for Street Rehabilitation Package 8 – Overlay

Closes 12/1/2026Opened 10/28/2026

City of San Antonio·Texas

95% match

23-04203-07 2027 Street Rehabilitation Package 7 – Overlay

Closes 12/15/2026Opened 10/28/2026

City of San Antonio·Texas

95% match

23-04203-05 2027 Street Rehabilitation Package 5 - Overlay

Closes 12/8/2026Opened 10/28/2026

Texas City of San Antonio·Texas

95% match

2027 Street Rehabilitation Package 6 - Overlay

Closes 12/11/2026Opened 10/28/2026

City of San Antonio·Texas

94% match

23-04203-06 2027 Street Rehabilitation Package 6 - Overlay

Closes 12/11/2026Opened 10/28/2026

Texas City of San Antonio·Texas

94% match

2027 Street Rehabilitation Package 5 – Overlay

Closes 12/8/2026Opened 10/28/2026

Texas City of San Antonio·Texas

93% match

2027 Street Rehabilitation Package 7 – Overlay

Closes 12/15/2026Opened 10/28/2026

Texas City of San Antonio·Texas

92% match

2027 Task Order Contract for Street Rehabilitation Package 4 Flatwork

Closes 11/24/2026Opened 10/21/2026

City of San Antonio·Texas

91% match

23-04203-04 2027 Task Order Contract for Street Rehabilitation Package 4 Flatwork

Closes 11/24/2026Opened 10/21/2026

City of San Clemente·California

85% match

FY 2027 Arterial Street Improvement

Closes 11/5/2026Opened 10/15/2026

Texas City of Waco·Texas

84% match

RFB 2026-061, Pavement Rehabilitation District 1

Closes 12/8/2026Opened 10/27/2026

Texas City of San Antonio·Texas

84% match

Texas A&M University Area Streets (Maria Ferrier Ave. to Mauermann Road) Phase 2 (2022 Bond)

Closes 11/3/2026Opened 10/2/2026

City of Salinas·California

84% match

2026 Citywide Sidewalk Repair Project

Closes 11/23/2026Opened 10/23/2026

San Joaquin County Department of Public Works·California

83% match

Main Street Resurfacing, Federal Aid Project No. STPL‑5929(334)

Closes 11/5/2026Opened 10/6/2026

City of Vista·California

83% match

As-Needed Concrete Construction (CIP No. 8290)

Closes 11/25/2026Opened 10/22/2026

Texas City of San Antonio·Texas

83% match

Citywide On-Call Plumbing Services

Closes 11/20/2026Opened 10/5/2026

City of San Antonio·Texas

83% match

6100019852 Ready Mix Concrete

Closes 11/4/2026Opened 9/23/2026

City of San Antonio·Texas

83% match

23-03921A Texas A&M University Area Streets (Maria Ferrier Ave. to Mauermann Rd) Phase 2 (2022 Bond)

Closes 11/3/2026Opened 10/2/2026

City of Modesto, CA·California

83% match

TUOLUMNE BOULEVARD PAVEMENT REHABILITATION

Closes 11/3/2026Opened 9/1/2026

Webb County·Texas

83% match

Project No. CSJ 0922-33-230

Closes 10/30/2026Opened 10/8/2026

City of Norman·Oklahoma

83% match

Bid 2627-1 - FYE 2027 Street Maintenance Bond Urban Concrete

Closes 11/12/2026Opened 10/16/2026

City of San Antonio·Texas

83% match

23-03900 Hays Street Bridge Connections & Eastside Area Streets (2022 Bond)

Closes 10/30/2026Opened 9/30/2026

The City of Anaheim·California

83% match

Katella Ave & State College Blvd Rehabilitation Project

Closes 11/5/2026Opened 10/15/2026

City of Broken Arrow·Oklahoma

83% match

Dallas Street Rehabilitation:

Closes 11/17/2026Opened 9/29/2026