Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Minnesota guideMinnesota Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More water and wastewater bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Minnesota
  4. ›Closed bids
  5. ›High Service Pumps #1 and #2 Improvements (25-325)

City of Burnsville·Minnesota

High Service Pumps #1 and #2 Improvements (25-325)

Closes 6/23/2026$500k – $2MInvitation for BidLogin requiredFee to access
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

This project involves the comprehensive refurbishment of high‑service water pumping units at the City of Burnsville’s water treatment plant. The scope covers removal, inspection, rehabilitation, and selective replacement of vertical turbine pumps and associated motors, installation of new high‑service pumps, vertical hollow‑shaft motors, and inverter‑duty motors to support future variable‑frequency‑drive operation, as well as condition‑based component replacement and bid alternates. • Removal, inspection, and rehabilitation of existing high‑service pumps and motors. • Supply and installation of new vertical turbine pumps, hollow‑shaft motors, and inverter‑duty motors. • Provision of all labor, materials, equipment, testing, and incidental work for a complete, operational pump station upgrade. • Delivery of detailed contract documents through QuestCDN (download fee $42) with electronic bid submission only. • Mandatory pre‑bid conference on June 4, 2026; bids due electronically by June 23, 2026.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Dan Meger(Owner Contact)

[email protected]

(952) 895-4540

Key dates

Opened
5/18/2026
Pre-bid meeting
6/4/2026
Closes
6/23/2026
Projected award
7/7/2026

Last updated

Details

Type
Invitation for Bid
Industry
Water Management and Sanitation
NAICS
237110
Solicitation №
Quest Number: 10177687

Budget estimate

$500,000 – $2,000,000

No contract value is disclosed, but similar high‑service pump replacement projects typically range from $500 K to $2 M in total construction cost, depending on the number of pumps, motor sizes, and site‑specific conditions. This estimate assumes complete removal, refurbishment, and installation of multiple pump units with associated electrical and control upgrades.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Belton-Honea Path Water Authority·South Carolina

Top match · 71%

WTP High Service Pumping Improvements

Closes 10/22/2026Opened 9/23/2026

City of Charlotte·North Carolina

71% match

Service Water Improvements and Flow Meter Modifications

Rolling / TBD closeOpened 1/31/2026

City of Plymouth, Minnesota·Minnesota

68% match

Zachary WTP High Service Pump 3, 4, and 5 Maintenance Project

Closes 10/29/2026Opened 10/9/2026

City of Chesapeake·Virginia

68% match

IFB 27-014-2230 Pump Station #43 Replacement

Closes 10/27/2026Opened 9/25/2026

City of Lakeland·Florida

68% match

Annual Water Treatment Plant High Service Pump Maintenance Contractor

Closes 10/29/2026Opened 10/5/2026

City of Tampa, Florida·Florida

67% match

26-C-00038 Pump Station Resiliency and Reliability Improvements Contract A

Closes 10/13/2026Opened 9/23/2026

U.S. Department Of Defense·Ohio

67% match

29--PUMP,FUEL METERING

Closes 10/13/2026Opened 9/28/2026

City of Tampa, Florida·Florida

66% match

26-C-00040 Pump Station Resiliency and Reliability Improvements Contract C

Closes 10/13/2026Opened 9/23/2026

U.S. Department Of Defense·United States of America

66% match

29--PUMP,FUEL,METERING AND

Closes 10/19/2026Opened 10/5/2026

U.S. Department Of Defense·United States of America

66% match

29--PUMP,FUEL,METERING AND

Closes 10/13/2026Opened 9/29/2026

U.S. Department Of Defense·Ohio

66% match

43--PUMP HYDROSTATIC

Closes 10/13/2026Opened 9/27/2026

Madison Metropolitan Sewerage District·Wisconsin

66% match

Pump Repair and Maintenance

Closes 10/16/2026Opened 9/30/2026

U.S. Department Of Defense·Virginia

66% match

John H. Kerr and Philpott Sump Pumps

Closes 10/13/2026Opened 10/1/2026

Santa Maria Public Airport District·California

66% match

Sump Pump Replacement and Installation

Closes 10/16/2026Opened 9/30/2026

City of Lewiston·Maine

65% match

2026-039 2026 Pump Station Replacements - Foss 2 and Sabattus

Closes 10/27/2026Opened 8/12/2026

U.S. Department Of Defense·North Carolina

65% match

John H. Kerr and Philpott Sump Pumps

Closes 10/13/2026Opened 10/1/2026

Upper Occoquan Service Authority·Virginia

65% match

UOSA IFB 27-02 P2NR+ Construction

Closes 10/22/2026Opened 8/24/2026

U.S. Department Of Defense·United States of America

65% match

43--PUMP,HYDRAULIC

Closes 10/22/2026Opened 10/13/2026

U.S. Department Of Defense·United States of America

65% match

16--PUMP,AXIAL PISTONS - AND SIMILAR REPLACEMENT PARTS, IN REPAIR/MODIFICATION OF

Closes 10/13/2026Opened 10/9/2026

U.S. Department Of Defense·Ohio

65% match

29--PUMP,FUEL,METERING AND

Closes 10/14/2026Opened 9/29/2026

U.S. Department Of Defense·United States of America

65% match

43--PUMP,HYDRAULIC

Closes 10/20/2026Opened 10/6/2026

City of Chesapeake, VA·Virginia

65% match

Pump Station 43 Replacement

Closes 10/27/2026Opened 9/25/2026

U.S. Department Of Defense·United States of America

65% match

29--PUMP,FUEL,CAM ACTUATED

Closes 10/13/2026Opened 9/29/2026

City of Philadelphia·Pennsylvania

65% match

Pump Repair Parts

Closes 10/28/2026Opened 10/6/2026

U.S. Department Of Defense·United States of America

65% match

29--PUMP,FUEL,CAM ACTUATED

Closes 10/26/2026Opened 10/13/2026