Description
The Muscatine Power and Water is seeking bids for the construction of a new sump, pumping system, piping, electrical, controls, and safety equipment at the Unit 9 ground floor trench. The project requires the demolition of the existing Unit 9 building finished floor and the construction of a new capture sump and return system. The bid documents are available at the office of Muscatine Power and Water, and a pre-bid meeting will be held on April 9, 2026. The project is expected to start within 15 calendar days of written authorization to proceed and must be completed by July 2, 2026.
Key features of the project include:
• Demolition of existing Unit 9 building finished floor
• Construction of a new sump, pumping system, piping, electrical, controls, and safety equipment
• Connection to the existing Unit 9 ground floor trench
• Proper PPE required to access the work site
• Commencement of contract within 15 calendar days of written authorization to proceed
• Contract completion by July 2, 2026