Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Iowa guideIowa Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More energy and utilities bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Iowa
  4. ›Closed bids
  5. ›UNIT 9 ELG – GROUND FLOOR BATW CAPTURE SUMP AND RETURN SYSTEM

Muscatine Power and Water·Iowa

UNIT 9 ELG – GROUND FLOOR BATW CAPTURE SUMP AND RETURN SYSTEM

Closes 4/29/2026$500k – $2MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Muscatine Power and Water is seeking bids for the construction of a new sump, pumping system, piping, electrical, controls, and safety equipment at the Unit 9 ground floor trench. The project requires the demolition of the existing Unit 9 building finished floor and the construction of a new capture sump and return system. The bid documents are available at the office of Muscatine Power and Water, and a pre-bid meeting will be held on April 9, 2026. The project is expected to start within 15 calendar days of written authorization to proceed and must be completed by July 2, 2026. Key features of the project include: • Demolition of existing Unit 9 building finished floor • Construction of a new sump, pumping system, piping, electrical, controls, and safety equipment • Connection to the existing Unit 9 ground floor trench • Proper PPE required to access the work site • Commencement of contract within 15 calendar days of written authorization to proceed • Contract completion by July 2, 2026

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Lani Stanton(Project Specialist)

[email protected]

Key dates

Opened
3/25/2026
Questions due
4/24/2026
Pre-bid meeting
4/9/2026
Closes
4/29/2026
Duration
94 days

Last updated

Details

Type
Invitation for Bid
Industry
Energy and Utilities
NAICS
221110
Solicitation №
1C-GN250449

Budget estimate

$500,000 – $2,000,000

Based on the scope of the project, which involves the demolition of existing infrastructure and the construction of a new sump, pumping system, and related equipment, the estimated budget for this project could be in the range of $500,000 to $2 million. This estimate takes into account the cost of labor, materials, and equipment required for the project, as well as the need for proper PPE and safety equipment. The actual budget may vary depending on the complexity of the project, the number of bidders, and other factors.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

We’re still matching similar opportunities to this one — check back soon.