Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • Arizona guideArizona Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Arizona
  4. ›Sundog Trunk Main Sewer Phase C3

City of Prescott·Arizona

Sundog Trunk Main Sewer Phase C3

Closes 10/15/2026$5M – $15MInvitation for Bid
Get bids like this by emailBid source

Description

The City of Prescott is seeking qualified contractors to design and construct the Sundog Trunk Main Sewer Phase C3, a major public‑works effort that will centralize wastewater treatment by building a new regional lift station, installing approximately 25,000 ft of 26‑in. force main, and adding 2,500 ft of 24‑in. gravity trunk and branch mains. The work must be completed within 720 calendar days and includes extensive traffic control, environmental protection for the impaired Granite Creek corridor, and coordination with existing infrastructure. The project is funded as a capital improvement and will be awarded after a mandatory pre‑bid conference and a formal bid opening on October 15, 2026. • Mandatory pre‑bid conference – Sept 8, 2026 (attendance required). • Bid submission deadline – Oct 15, 2026, 2:00 pm via OpenGov portal. • Project scope: new lift station, 26‑in. force main (~25 k ft), 24‑in. gravity sewer (~2.5 k ft), associated utility relocations, traffic control, storm‑water pollution prevention, and site restoration. • Urban environment: downtown streets, residential areas, parks, and State Route 89; requires careful traffic management and erosion control. • Contract term: 720 days, with anticipated notice to proceed – Nov 30, 2026 and completion – Nov 19, 2028. • Mandatory insurance and bonding requirements; contractor must hold Arizona ROC license.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Jason Ferguson(Contracts Coordinator)

[email protected]

(928) 350-5230

Key dates

Opened
8/28/2026
Questions due
10/6/2026
Pre-bid meeting
9/8/2026Mandatory
Closes
10/15/2026
Duration
720 days

Last updated

Details

Type
Invitation for Bid
Industry
Civil Engineering
NAICS
237310
Solicitation №
2026-NIBCONST-559

Budget estimate

$5,000,000 – $15,000,000

The solicitation does not disclose a total contract value, but the scope (≈25 k ft of 26‑in. HDPE force main, lift‑station construction, extensive traffic control, and numerous ancillary works) suggests a multi‑million‑dollar project. Comparable municipal sewer trunk‑main projects in Arizona typically range from $5 M to $15 M depending on material costs, site conditions, and contingency allowances. Therefore, a reasonable estimate for the award amount is between $5 M and $15 M. Factors influencing the final figure include HDPE pipe price fluctuations, site‑specific geotechnical challenges, and the extent of traffic‑control and environmental mitigation required.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Pueblo·Colorado

Top match · 85%

Construction of Sun Mountain Boulevard

Closes 10/21/2026Opened 9/22/2026

Gateway Services Community Development District·Florida

85% match

Sanitary Sewer Rehabilitation

Closes 10/21/2026Opened 9/18/2026

City of Phoenix·Arizona

85% match

LARGE DIAMETER SANITARY SEWER REHABILITATION - GRADE 5 & 4 MANHOLES - NORTH - ZONES 5 & 6 - DESIGN-BID-BUILD

Closes 10/27/2026Opened 10/1/2026

Massachusetts Town of Agawam·Massachusetts

85% match

Main Street Sewer Rehab Project

Closes 10/14/2026Opened 9/30/2026

City of Ponca·Oklahoma

85% match

Ponca City Sanitary Sewer Bois D Arc' Phase III

Closes 1/30/2027Opened 1/14/2025

Georgia Ellijay-Gilmer County Water & Sewerage Authority·Georgia

85% match

South Main Street Lift Station

Closes 11/12/2026Opened 10/5/2026

City of Walterboro·South Carolina

85% match

Middle Ireland Creek Sewer Trunk Line Rehabilitation

Closes 10/27/2026Opened 9/25/2026

Georgia City of Valdosta·Georgia

84% match

Stallings Lift Station & Force Main Improvements

Closes 11/5/2026Opened 8/11/2026

City of Cincinnati·Ohio

84% match

Barrington Hills Pump Station Eliminations (10230090)

Closes 10/27/2026Opened 10/7/2026

City of Cincinnati·Ohio

84% match

Barrington Hills Pump Station Eliminations (10230090)

Closes 10/15/2026Opened 9/23/2026

City of San Luis·Arizona

84% match

Sewer Manhole Drop Connection Repair - Merrill Ave and Ramona St.

Closes 10/21/2026Opened 10/4/2026

City of Cheyenne·Wyoming

83% match

Van Buren Ave - Street Curb and Gutter Improvements

Closes 10/27/2026Opened 9/23/2026

Georgia City of Lagrange·Georgia

83% match

South Davis Road (SR14) Water and Sewer Relocations

Closes 11/5/2026Opened 10/5/2026

Georgia City of Bainbridge·Georgia

83% match

ADVERTISMENT FOR BIDS SANITARY SEWER EXPANSION 2026

Closes 11/10/2026Opened 10/7/2026

City of Cincinnati·Ohio

83% match

Camargo Canyon Pump Station Elimination (10270026)

Closes 11/10/2026Opened 10/8/2026

Malvern Water Works·Arkansas

83% match

MOLINE STREET SEWAGE LIFT STATION

Closes 10/27/2026Opened 9/27/2026

City of Douglas·Wyoming

83% match

Sanitary Sewer and Misc. WWTP Improvements Project

Closes 11/3/2026Opened 10/7/2026

City of Columbus Ohio·Ohio

83% match

Central College Subtrunk – Phase 3

Closes 11/18/2026Opened 9/8/2026

City of Philadelphia·Pennsylvania

83% match

PW Prequal Bid 2325 SEWER RECONSTRUCT.& RELAY of WATER MAINS in S CONESTOGA ST - LUDLOW ST to MARKET

Closes 10/22/2026Opened 10/2/2026

City of Cincinnati·Ohio

83% match

Barrington Hills Pump Station Eliminations (10230090)

Closes 10/27/2026Opened 9/17/2026

City of Cincinnati·Ohio

83% match

Barrington Hills Pump Station Eliminations (10230090)

Closes 10/15/2026Opened 10/5/2026

The City of Columbus·Ohio

83% match

RFQ033611 - Central College Subtrunk, Phase 3 (650033-100003)

Closes 11/18/2026Opened 9/30/2026

City of Port Arthur·Texas

83% match

3RD AVENUE LIFT STATION PROJECT

Closes 10/28/2026Opened 10/13/2025

City of San Diego·California

82% match

Alvarado Trunk Sewer Ph IV and Water Main Relocations Bid Package A - ADVERTISEMENT ONLY

Closes 10/28/2026Opened 9/1/2026

City of Philadelphia·Pennsylvania

82% match

PW Prequal Bid 2797 SEWER RECONSTRUCTION & RELAY of WATER MAINS in PECHIN ST from DUPONT ST to LEVER

Closes 10/22/2026Opened 10/2/2026