The City of Prescott is seeking qualified contractors to design and construct the Sundog Trunk Main Sewer Phase C3, a major public‑works effort that will centralize wastewater treatment by building a new regional lift station, installing approximately 25,000 ft of 26‑in. force main, and adding 2,500 ft of 24‑in. gravity trunk and branch mains. The work must be completed within 720 calendar days and includes extensive traffic control, environmental protection for the impaired Granite Creek corridor, and coordination with existing infrastructure. The project is funded as a capital improvement and will be awarded after a mandatory pre‑bid conference and a formal bid opening on October 15, 2026.
• Mandatory pre‑bid conference – Sept 8, 2026 (attendance required).
• Bid submission deadline – Oct 15, 2026, 2:00 pm via OpenGov portal.
• Project scope: new lift station, 26‑in. force main (~25 k ft), 24‑in. gravity sewer (~2.5 k ft), associated utility relocations, traffic control, storm‑water pollution prevention, and site restoration.
• Urban environment: downtown streets, residential areas, parks, and State Route 89; requires careful traffic management and erosion control.
• Contract term: 720 days, with anticipated notice to proceed – Nov 30, 2026 and completion – Nov 19, 2028.
• Mandatory insurance and bonding requirements; contractor must hold Arizona ROC license.