The Department of the Navy (DON) seeks commercial vendors to design, manufacture, transport, construct, and commission modular, industrialized‑construction (IC) barracks for multiple East Coast installations. The effort covers roughly 1.7 million sq ft of new or replacement barracks across Camp Lejeune, Camp Geiger, Camp Parris Island, Quantico, and Cherry Point. Vendors must submit a ten‑page white paper by 29 Oct 2026 demonstrating:
• At least three IC projects ≥ $50 M each in the past 10 years (aggregate ≥ $150 M preferred).
• Ability to reduce design/construction cost ≥ 20 % and schedule ≥ 30 % versus traditional methods (target 9‑12 month design‑approval window).
• Capability to deliver modular units using volumetric, hybrid, or Kit‑of‑Parts approaches, meeting or exceeding DoD UFC/WBDG standards.
• Bonding capacity, logistics, and quality‑control frameworks for large‑scale projects in the Southwestern U.S. (though the barracks are on the East Coast, the solicitation notes Southwestern U.S. capability). Successful white‑paper submitters may be invited to a Request for Project Proposal (RPP) phase, potentially leading to a follow‑on production OTA without further competition.
• Total scope: ~12 buildings, 1,723,259 sf, ~2,500‑3,000 rooms.
• Required experience: ≥ 3 IC projects ≥ $50 M each; aggregate > $150 M.
• Evaluation criteria: Relevant experience, technical approach, vendor capability.
• Submission format: 10‑page white paper (title page & exec summary excluded), emailed to primary contacts.
• Questions due: 19 Oct 2026; submission deadline: 29 Oct 2026.