Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • New Mexico guideNew Mexico Bids and Bidding Guide
  • Compliance checkHow to Ensure RFP Compliance
  • How to answer an RFPChoosing and Responding to Government Bids
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›New Mexico
  4. ›Closed bids
  5. ›Ute Dam Outlet Works Modification Project

New Mexico Interstate Stream Commission·New Mexico

Ute Dam Outlet Works Modification Project

Closes 6/23/2026$5M – $15MRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Ute Dam Outlet Works Modification Project is a state‑funded civil‑engineering construction effort to repair, upgrade, and modernize the outlet works at Ute Dam in Logan, New Mexico. The contract will be awarded to a single prime contractor (sub‑contractors allowed with consent) to perform underwater bulkhead work, pipe inspection, bypass installation, electrical control upgrades, and associated commissioning and documentation. The solicitation requires mandatory participation in a pre‑proposal virtual conference and a mandatory on‑site visit, with a final proposal due July 1, 2026. The contractor must provide bid, performance, and payment bonds, maintain extensive insurance, and adhere to strict dam‑safety, environmental, and OSHA regulations. • Repair and underwater installation/removal of bulkhead at the dam intake; provide qualified dive team and equipment. • Conduct video inspection of existing 60‑inch and 42‑inch outlet‑works pipes and remove/replace a 6‑inch fill pipe and gate valve. • Install a 10‑inch stainless‑steel bypass system with electric‑actuated multi‑orifice and butterfly valves, flowmeter, and associated electrical power and control upgrades. • Perform pipe‑lining/coating repairs, commissioning, testing, and deliver O&M manuals plus training to ISC staff. • Meet a 336‑day completion window, with $3,700 per day liquidated‑damages for schedule overruns; provide 5 % bid bond, 100 % performance/payment bonds, and required insurance coverage.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Maria Lugo‑Mee(Procurement Manager)

Maria.Lugo‑[email protected]

(505) 412-7965

Key dates

Opened
5/21/2026
Questions due
6/18/2026
Pre-bid meeting
6/1/2026Mandatory
Site visit
6/17/2026Mandatory
Closes
6/23/2026
Duration
336 days

Last updated

Details

Type
Request for Proposal
Industry
Civil Engineering
NAICS
237990
Solicitation №
61-55000-26-01208

Budget estimate

$5,000,000 – $15,000,000

Given the extensive scope—underwater bulkhead repair, video pipe inspection, installation of a stainless‑steel bypass system, electrical upgrades, and a full commissioning package—similar dam‑modification contracts in the Southwest have ranged from $5 million to $15 million. The lower end reflects a minimalist design with limited subcontracting; the higher end accounts for full‑service delivery, high‑spec stainless steel components, and strict dam‑safety compliance. Therefore, a reasonable estimate for the total contract award is between $5 M and $15 M.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Defense·Kentucky

Top match · 70%

Fishtrap Lake Intake Structure and Dam Rehabilitation; W91237-26-R-A020

Closes 11/6/2026Opened 10/9/2026

Commonwealth of Pennsylvania - Department of Conservation and Natural Resources·Pennsylvania

67% match

Upgrade Dam Control Facilities – Shikellamy State Park

Closes 10/15/2026Opened 9/16/2026

Commonwealth of Pennsylvania - Department of Conservation and Natural Resources·Pennsylvania

67% match

Upgrade Dam Control Facilities – Shikellamy State Park

Closes 10/15/2026Opened 9/16/2026

Alaska Department of Natural Resources·Alaska

67% match

Chena River State Recreation Area Upper Stiles Creek Shooting Range Improvements – Project 70011‑1

Closes 10/15/2026Opened 9/22/2026

U.S. Department Of Defense·Louisiana

67% match

Flood Control, Amite River Tributaries, Louisiana, Comite River Basin, Comite River Diversion Project, Bayou Baton Rouge Rock Chute, East Baton Rouge Parish, Louisiana

Closes 2/6/2027Opened 11/5/2024

Navajo Nation·Arizona

67% match

Proposal for the Tohatchi Diversion Project

Closes 11/20/2026Opened 9/16/2026

Commonwealth of Pennsylvania - Department of Conservation and Natural Resources·Pennsylvania

66% match

Upgrade Dam Control Facilities – Shikellamy State Park

Closes 10/15/2026Opened 9/16/2026

State of Tennessee·Tennessee

66% match

Chickasaw State Park Stem Repair

Closes 10/22/2026Opened 10/7/2026

Ohio Department of Natural Resources·Ohio

66% match

Cowan Lake Dam Improvements

Closes 10/28/2026Opened 10/2/2026

Oregon City of Monroe·Oregon

66% match

Water System Modernization and Raw Water Intake Improvements

Closes 10/23/2026Opened 9/22/2026

NYS State University Construction Fund·New York

66% match

Reconstruct Water Distribution System - Ellicott Quad

Closes 10/14/2026Opened 9/15/2026

Tangipahoa Parish Government·Louisiana

65% match

PROJECT: 065 TANGIPAHOA PARISH STORMWATER DRAINAGE ENHANCEMENTS THROUGH CULERT MODIFICATIONS IN TICKFAW & MAUREPAS WATERSHEDS PROJECT

Closes 10/21/2026Opened 9/14/2026

U.S. Department Of Defense·Oregon

65% match

Sources Sought: The Dalles Dam Gate Repair Pit Fire Protection and Life Safety Upgrades

Closes 10/15/2026Opened 9/28/2026

City of Laredo·Texas

65% match

Zacate Creek Renovation ORLP/TPWD Project

Closes 10/29/2026Opened 9/13/2026

U.S. Department Of The Interior·Utah

65% match

EAST CANAL EFFICIENCY IMPROVEMENTS

Closes 11/20/2026Opened 9/4/2026

City of Thornton·Colorado

65% match

New Union Ditch Concrete Channel Conversion and Headgate

Closes 11/5/2026Opened 10/1/2026

Commonwealth of Massachusetts, Executive Office of Energy & Environmental Affairs, Dept. of Conservation & Recreation·Massachusetts

65% match

Bellevue Pond Dam Rehabilitation

Closes 10/29/2026Opened 9/16/2026

U.S. Department Of Defense·Connecticut

65% match

Dike B Generator Installation, Mansfield Hollow Dam, Mansfield Center, CT

Closes 10/16/2026Opened 10/13/2026

NYS Cambria, Town of·New York

65% match

Baer Road Culvert Over East Branch of Twelve Mile Creek

Closes 11/5/2026Opened 10/9/2026

Environmental Conservation, NYS Department of·New York

65% match

Eighth Lake Campground Roadway, Water and Electrical System Improvements

Closes 10/28/2026Opened 9/29/2026

Trout Unlimited·Wyoming

65% match

South Fork Ditch Creek Fish Passage Project

Closes 10/30/2026Opened 10/9/2026

U.S. Department Of Transportation·Idaho

65% match

ID FLAP BONNER 841(1), Trestle Creek Road, MP 100 to 103.7

Closes 10/29/2026Opened 10/29/2024

City of Aurora, OH·Ohio

65% match

Aurora Park Utility Improvements - ReBid

Closes 11/5/2026Opened 10/9/2026

U.S. Department Of Transportation·Utah

65% match

UT NP ARCH 100(2) Bridges on Delicate Arch Road

Closes 11/10/2026Opened 9/29/2026

Laramie Rivers Conservation District·Wyoming

65% match

Laramie River - Hart Ranch Restoration

Closes 11/8/2026Opened 8/27/2026