The National Park Service is seeking a design‑build contractor to replace and relocate the Bullfrog launch ramp at Glen Canyon National Recreation Area, Utah. The contract will cover full engineering design, construction of a new 150‑ft‑wide concrete ramp, associated access road, parking facilities, utilities (water, sewer, power, telecom), and optional widening/paving options. The project is budgeted at roughly $54 million with a 710‑day performance period, and the selection will be made through a two‑phase best‑value process (technical qualification followed by detailed price proposal).
• 150‑ft‑wide, 10.5 % grade launch ramp serving both recreational vessels and a UDOT ferry.
• Two‑lane access road, 16‑acre parking area, and new utility infrastructure (potable water, wastewater lift stations, MV power, fiber‑optic communications).
• Optional scope includes ramp widening to 150 ft, parking expansion, and asphalt paving, exercisable within 90 days after award.
• Mandatory compliance with FAR, Buy‑American, environmental, and safety regulations; performance and payment bonds of 100 % required.
You found this one. Bid Banana has 1.6M+ bids and awards.
You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.