The City of Elko is seeking a contractor to fully rehabilitate the sidewalks surrounding the terminal building at Elko Regional Airport, including the installation of a radiant electric heating (snow‑melt) system. The work involves demolition of existing concrete sidewalks, curbs, gutters, bollards, signage, drainage boxes, valve covers, and electrical conduit, followed by construction of a new 4‑inch concrete sidewalk, curb ramps, barrier curbs, and installation of new standard and high‑impact concrete bollards. Additionally, a heated cable system with associated conduit, handholes, and control panels must be installed beneath the new sidewalk. The contract is a sealed‑bid, firm‑price construction agreement with a maximum performance period of 20 working days, requiring bid, performance, and payment bonds, as well as compliance with Buy‑American, Davis‑Bacon, DBE, and other federal requirements.
• Demolition and removal of approximately 1,060 SY of existing sidewalk and related infrastructure.
• New construction of ~1,090 SY of 4‑inch concrete sidewalk, 51 SY curb ramp, and 440 LF barrier curb.
• Installation of 13 standard and 4 high‑impact concrete bollards, new signage, and a complete snow‑melt heating system.
• Mandatory bonding (5 % bid bond, 100 % performance/payment bonds) and adherence to extensive federal labor, procurement, and environmental standards.