Clark County is seeking qualified contractors to design and construct reinforced‑concrete channel and culvert extensions, a paved trail, maintenance roads, and associated storm‑drain infrastructure for the Flamingo Wash segment between University Center Drive and Palos Verdes Street. The work includes concrete channel, box, pipe, drop inlets, manholes, asphalt pavement, fencing, conduit, pull boxes, signage, striping, and monitoring equipment. The contract is a 270‑day calendar schedule with a bid opening on 10/12/2026. Contractors are responsible for minor debris removal, shoring, and compliance with de‑watering requirements.
• Reinforced‑concrete channel and culvert extensions (10‑ft × 7‑ft and 12‑ft × 8‑ft RCBs)
• Paved multi‑use trail along north side of wash
• Maintenance roads, access ramps, and site grading
• Storm‑drain components: drop inlets, manholes, conduit, pull boxes, signage, striping
• Fencing (expanded metal) and monitoring equipment installation
• Contractor‑provided shoring, minor debris/vegetation removal, and de‑watering (lump‑sum)
• 270‑day construction window, no schedule extensions granted
• Mandatory pre‑bid WebEx meeting on 9/17/2026 (optional attendance)