The BLM is seeking qualified contractors to design, drill, construct, and complete a livestock water well at the Gray Wall site in Natrona County, WY. The work includes drilling a 150‑ft well, installing PVC and steel casings, well screen, gravel pack, formation stabilizer, development, testing, and disinfection, all to meet Wyoming State Water Well Minimum Construction Standards and prevailing‑wage requirements. The contract will be awarded on a firm‑fixed‑price basis under a small‑business set‑aside, with a performance period extending through August 2027.
• Drill 150 LF well (minimum 9½‑in. diameter) to 150 ft depth.
• Install 5‑in. PVC casing, 5‑in. well screen, 8‑in. steel protective casing, gravel pack, and formation stabilizer.
• Perform well development, testing (minimum 3 GPM), and chemical disinfection; deliver as‑built documentation.
• Comply with DOL prevailing‑wage rates (Natrona County) and BLM Buy‑American, work‑hour, and fire‑danger season restrictions.
You found this one. Bid Banana has 1.6M+ bids and awards.
You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.