Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Tennessee guideTennessee Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Tennessee
  4. ›Closed bids
  5. ›Del Rio Pike Roadway Widening & Culvert Improvement

City of Franklin·Tennessee

Del Rio Pike Roadway Widening & Culvert Improvement

Closes 7/14/2026$500k – $2MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Franklin, Tennessee is seeking bids for the Del Rio Pike Roadway Widening & Culvert Improvement project. The project involves the furnishing of all materials, equipment, and labor for the construction of the Del Rio Roadway Widening and Culvert Improvements. The project requires the contractor to obtain necessary permits, including a Grading Permit and a Construction General Permit. The contractor must also comply with all requirements of the permits and assist the City as needed. The project includes the installation of a slip liner pipe, grouting of the annular space, and other related work. • The project requires the contractor to clear the line of obstructions, solids, dropped joints, protruding service connections, or collapsed pipe that will prevent the insertion of the liner pipe. • The contractor must provide a TDEC Level 1 Certified Inspector and conduct site inspections twice a week, as well as after major weather events. • The contractor must comply with all requirements of the permits and assist the City as needed. • The project includes the installation of a slip liner pipe, grouting of the annular space, and other related work.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Allison Davis(Project Manager)

[email protected]

(615) 550-6637

Key dates

Opened
6/16/2026
Questions due
7/7/2026
Closes
7/14/2026

Last updated

Details

Type
Invitation for Bid
Industry
Civil Engineering
NAICS
237990
Solicitation №
2026-029 Addendum 2

Budget estimate

$500,000 – $2,000,000

The budget for this project is estimated to be between $500,000 and $2,000,000, based on the scope of work and industry standards for similar projects. The final budget will depend on the contractor's bid and the City's evaluation of the bids. Factors that may influence the budget include the complexity of the project, the materials and equipment required, and the contractor's experience and qualifications.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Ladue·Missouri

Top match · 70%

2025 Culvert Repairs Project - Ladue, MO

Closes 11/5/2026Opened 10/6/2026

NYS Cambria, Town of·New York

70% match

Baer Road Culvert Over East Branch of Twelve Mile Creek

Closes 11/5/2026Opened 10/9/2026

City of Charlotte·North Carolina

69% match

Gleneagles Storm Drainage Improvement Project

Rolling / TBD closeOpened 3/23/2026

Massachusetts Department of Transportation·Massachusetts

69% match

616375 LEOMINSTER FAP No. EMR/STP/PRC-EMRS(123)X Culvert Replacement, Culvert Repair and Retaining

Closes 10/20/2026Opened 9/8/2026

City of Charlotte·North Carolina

68% match

Moorland Dr 3831 Storm Drainage Improvement Project

Closes 1/1/2027Opened 5/13/2026

Snohomish County·Washington

68% match

Stanwood/Marine Drive Culvert Replacement

Closes 11/3/2026Opened 10/7/2026

Massachusetts Town of Williamstown·Massachusetts

68% match

Berlin Culvert Stabilization Slip Lining

Closes 10/21/2026Opened 9/30/2026

City of Riverside, MO·Missouri

68% match

Riverway Boulevard Improvements - Riverside, MO

Closes 10/15/2026Opened 9/9/2026

Georgia Fayette County Board of Commissioners·Georgia

68% match

27038-B Greenfield Circle (250) Culvert Replacement

Closes 10/16/2026Opened 9/23/2026

NYS Tioga County·New York

68% match

Replacement of Day Hollow Road Culvert over Unnamed Tributary

Closes 10/15/2026Opened 9/15/2026

Georgia City of Walnut Grove·Georgia

68% match

FY 2027 Park Street Drainage Repair Project

Closes 10/14/2026Opened 9/11/2026

Massachusetts City of Gardner·Massachusetts

68% match

2027-011 Keyes Road Culvert Replacement

Closes 10/29/2026Opened 10/7/2026

City of El Paso De Robles·California

68% match

Riverside Avenue Improvements from 17th to 21st Street

Closes 11/5/2026Opened 9/24/2026

Oregon Clackamas County·Oregon

68% match

BID 2026-65 Bear Creek Culvert and Molalla Ave Shoulders Project

Closes 10/14/2026Opened 9/22/2026

U.S. Department Of Transportation·Washington

68% match

WA FWS LPO MULTI(1) Little Pend Oreille NWR Culvert Improvements

Closes 10/20/2026Opened 10/13/2026

Snohomish County·Washington

68% match

2027 123rde Ave NE Culvert Replacements – RR48109, WC8109, UPI 21-20028

Closes 10/20/2026Opened 9/30/2026

Texas City of San Antonio·Texas

67% match

George Road Low Water Crossing (Hunters Bow to NW Military Highway)

Closes 11/3/2026Opened 9/25/2026

Commonwealth of Pennsylvania - Department of Conservation and Natural Resources·Pennsylvania

67% match

Structure Replacements – Bridge No. 09‑0071 and 09‑0070 – Merrill Road, Clearfield County, Pennsylvania

Closes 10/15/2026Opened 9/16/2026

Mount Ascutney Regional Commission·Vermont

67% match

Design Engineering: East Hill Rd Culvert Replacement

Closes 10/23/2026Opened 9/28/2026

City of Charlotte·North Carolina

67% match

Collective Culverts 1 Storm Drainage Improvement Project

Rolling / TBD closeOpened 2/11/2028

City of Charlotte·North Carolina

67% match

Lancer Dr 6818 Storm Drainage Improvement Project

Rolling / TBD closeOpened 10/19/2026

Massachusetts Department of Transportation·Massachusetts

67% match

606352 WAREHAM FAP No. PRC(PRC80)-003S(925)X Culvert and Dam Replacement on Cranberry Highway at R

Closes 10/14/2026Opened 8/10/2026

Massachusetts Town of Brewster·Massachusetts

67% match

Culvert & Bank Stabilization work

Closes 11/5/2026Opened 9/23/2026