The City of Saginaw is seeking a qualified contractor to remove existing carpet and install commercial‑grade luxury vinyl plank (LVP) flooring in two office spaces at its Wastewater Treatment Plant. The work covers approximately 600 sq ft and includes furniture protection, carpet disposal, substrate preparation, installation of LVP, cove base, transition strips, and final cleanup. Bidders must attend a mandatory site walk‑through on 9/22/2026 (or arrange another visit by 10/20/2026) and submit a sealed bid by 3 PM on 10/20/2026. The contract is “all‑or‑none,” requires no substitutions, and includes all labor, materials, equipment, and disposal costs.
• Scope: removal of carpet, pad, tack strips, disposal, floor preparation, install ~600 sq ft commercial LVP, cove base, transitions, and cleanup.
• Mandatory walk‑through 9/22/2026 (or schedule before 10/20/2026).
• Bid submission: sealed envelope, in person to Purchasing Office, 5 % bid bond if total > $100,000.
• Completion expected shortly after award; no specific duration stated.
• Contact: Chuck Thompson, Maintenance Supervisor (989‑759‑1791, cthompson@saginaw‑mi.com).