This contract calls for a district‑wide provider to perform ongoing stormwater retention pond maintenance across all Austin Community College properties, including vegetation management, sediment removal, minor and structural repairs, and compliance with City of Austin and Texas environmental regulations. The work must include routine mowing, debris removal, under‑drain cleaning, erosion control, and proper disposal of removed material, all while adhering to safety and permitting requirements.
• Scope covers all pond types (sedimentation, detention, filtration, re‑irrigation) within the ACC campus system and the Edwards Aquifer Authority jurisdiction.
• Contractor must supply all labor, equipment, PPE, insurance, and necessary permits; must submit inspection reports, corrective‑action plans, and cost proposals for any major repairs.
• Evaluation emphasizes experience, cost fairness, and SLBE (Small Local Business Enterprise) participation, with a deadline of 12 p.m. CST on March 26 2024 and contract start on June 3 2024.