The Alaska Energy Authority awarded a lump‑sum contract to replace three diesel engine‑generator sets, two charge‑air coolers, and two glycol radiators at the remote Akiachak power plant, including demolition, installation of owner‑furnished equipment, switchgear modifications, VFD replacements, fire‑detection/suppression upgrades, and full commissioning. The project is funded by state resources and EPA assistance, valued at roughly $1‑$2 million, with a bid opening on 18 Apr 2023 and substantial completion required by 1 Dec 2023.
• Base scope: demolition of existing gensets, installation of three new owner‑furnished diesel generators, two new charge‑air coolers, and two new radiators.
• Optional alternates: additional generator replacement, radiator replacement, VFD replacement, fire‑detection & alarm system, and water‑mist fire‑suppression system.
• Contractor must provide performance and payment bonds (100 % of contract price), a 5 % bid bond, and comply with DBE, EEO, Davis‑Bacon, and Alaska contractor licensing requirements.