The Wyoming State Construction Department, on behalf of the Wyoming Department of Health, is seeking design services for a pre-engineered metal building at the Wyoming State Hospital. The project includes design, cost estimates, construction administration, project closeout, and warranty period for an 80’ x 100’ pre-engineered metal building on a concrete slab and foundation. The contract was awarded to Crest, LLC. Key aspects of the project include:
• Pre-engineered metal building design
• Cost estimates at 50% and 95% bidding
• Construction administration
• Project closeout and warranty period
• Mandatory pre-proposal conference
• Proposals submitted through the Public Purchase online bidding system
The contract value is not explicitly stated in the document, but based on the scope of work, it is likely to be a significant amount.