Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Connecticut guideConnecticut Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More water and wastewater bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Connecticut
  4. ›Closed bids
  5. ›WEST HARTFORD CENTER SPECIAL ACCELERATED WATER MAIN REPLACEMENT PRO…

Awarded contract·The Metropolitan District·Connecticut

WEST HARTFORD CENTER SPECIAL ACCELERATED WATER MAIN REPLACEMENT PROJECT

Won by Ludlow Construction$3.9MAwarded 11/12/2020Single Award
Contract source

Awarded vendors

  • Ludlow Construction

Description

This contract awards the design‑build and construction of approximately 2,700 linear feet of 24‑inch water main for the West Hartford Center. The scope includes labor, equipment, permits, and all related costs, with the owner supplying the pipe, valves, and fittings; the contractor provides the remaining materials and executes the installation. The project requires the contractor and its site superintendent to have completed at least two prior water‑main projects of 20 inches or larger, and all bidders must hold a current DAS Contractor Pre‑qualification Certificate. The award went to Ludlow Construction for a total contract value of $3,884,542.00. • Installation of ~2,700 ft of 24‑in water main in multiple MDC member towns. • Contractor must possess specific pre‑qualification certifications and prior large‑diameter water‑main experience. • Single‑award, firm‑fixed‑price contract issued by the Metropolitan District Commission.

Attached files

The award documents live at the source — open the contract source above to download them.

Key dates

Bids closed
10/30/2020
Intent to award
11/12/2020
Awarded
11/12/2020

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Water Management and Sanitation
NAICS
237110
Solicitation №
2020B-05

Contract value

$3,884,542

The award comment explicitly states a contract value of $3,884,542.00 for Ludlow Construction. This figure likely reflects the total firm‑fixed‑price amount for the entire water‑main replacement scope, including labor, equipment, permits, and any subcontracted work. No additional amounts are indicated, so the contract value is taken as $3.88 M.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

U.S. Department Of Defense·Connecticut

Top match · 74%

Construction of Chilled Water Plant and Site Utility Upgrades at VA Medical Center in West Haven, CT

Closes 11/6/2026Opened 9/30/2026

City of Dunedin·Florida

74% match

Willow Wood Village Water Main Replacement

Closes 10/19/2026Opened 9/18/2026

U.S. Department Of Defense·Massachusetts

73% match

Construction of Chilled Water Plant and Site Utility Upgrades at VA Medical Center in West Haven, CT

Closes 10/23/2026Opened 7/13/2026

Massachusetts Town of Abington·Massachusetts

71% match

Abington Central Street Water Main Improvements

Closes 10/28/2026Opened 10/7/2026

City of Edgewater, FL·Florida

71% match

Silver Ridge Water Main Replacement

Closes 11/10/2026Opened 10/8/2026

Hastings Utilities·Nebraska

71% match

Water Main Relocation St Joseph Ave from 7th to 8th Street HU 2026-43

Rolling / TBD closeOpened 5/4/2026

City of Austin·Texas

71% match

West Congress (Radam/St. Elmo) Water & WW Pipeline Renewal

Rolling / TBD closeOpened 7/13/2026

City of DeLand·Florida

71% match

2026 PARTS A-C, & F WALTS AVE & NEW ST WATER MAIN IMPROVEMENTS

Closes 11/12/2026Opened 10/9/2026

City of Charlotte·North Carolina

70% match

Fiscal Year 2026 Water Main Replacement

Rolling / TBD closeOpened 4/30/2026

City of Riverton·Wyoming

70% match

West Pershing Avenue Waterline Replacement Project

Closes 10/14/2026Opened 9/30/2026

Town of Groton·Connecticut

69% match

IPSWICH WATER TREATMENT PLANT, DWSRF 19229

Closes 10/26/2026Opened 9/1/2026

Waltham Housing Authority·Massachusetts

69% match

Water Service Replacement - Lower Pond

Closes 10/22/2026Opened 10/8/2026

Public Water Supply District No. 2 of St. Charles County·Missouri

69% match

Western Transmission Main Phase 4C

Closes 11/19/2026Opened 10/9/2026

Town of Eatonville·Florida

69% match

Drinking Water – Phase 1

Closes 11/9/2026Opened 10/6/2026

New York City Department of Design and Construction·New York

69% match

Emergency Water Main Work

Rolling / TBD closeOpened 4/27/2026

Connecticut Cromwell Fire District·Connecticut

69% match

Cromwell Fire District - Water Interconnection Project

Closes 11/6/2026Opened 9/29/2026

City of Morgan Hill·California

68% match

2026 Morgan Hill Water Main Replacement Project

Closes 10/20/2026Opened 9/25/2026

Massachusetts Boston Water & Sewer Commission·Massachusetts

68% match

Replacement and Rehabilitation of Water Mains, Storm Drains and Sewers in Hyde Park

Closes 10/14/2026Opened 9/16/2026

Massachusetts Waltham Housing Authority·Massachusetts

68% match

56-62 Pond Water Service

Closes 10/22/2026Opened 10/1/2026

Joint Municipal Water and Sewer Commission·South Carolina

68% match

JMWSC Water Main Improvements from Charter Oak Tank to Calks Ferry Tank

Closes 10/15/2026Opened 9/11/2026

City of Beaverton·Oregon

68% match

Erickson Ave Waterline Replacement (2nd St to 5th St)

Closes 10/21/2026Opened 9/30/2026

Connecticut Cromwell Fire District·Connecticut

68% match

Cromwell Fire District - Water Interconnection Project

Closes 11/6/2026Opened 9/29/2026

New York City Department of Design and Construction·New York

68% match

Emergency Water Main Work

Rolling / TBD closeOpened 4/24/2025

Connecticut Town of South Windsor·Connecticut

68% match

Clark Street Pump Station Main Replacement Project

Closes 11/4/2026Opened 10/6/2026