This project consists of labor, equipment, and materials necessary to construct three pier foundations for the purpose of supporting high voltage transmission poles. The bid was posted on August 25, 2022, and the submission deadline was September 13, 2022. However, all bids were rejected, and no award was made. The project specifications and documents are available for download, including instructions to bidders, proposal forms, and technical specifications.
• The project involves the construction of three pier foundations for high voltage transmission poles.
• The bid was posted on August 25, 2022, and the submission deadline was September 13, 2022.
• All bids were rejected, and no award was made.
• The project specifications and documents are available for download.
• The project requires the use of specific materials and equipment, including ready-mix concrete and anchor bolts.