Lexington One seeks a qualified contractor to perform an immediate pump‑out and disposal of approximately 100,000 gallons of accumulated wastewater sludge from the Gilbert Elementary School Wastewater Treatment Facility. The sludge buildup has reduced retention time, prompting an urgent removal. Contractors are invited to attend a site walk‑through to assess the lagoon layout and “far end” buildup areas before submitting written quotes. The solicitation includes standard terms and conditions and specifies that quotes be submitted by the stated deadline.
• Scope: Pump‑out ~100,000 gal of sludge, transport, and environmentally compliant disposal.
• Timeline: Immediate work required; quotes due March 17, 2026; site walk‑through available upon request.
• Contact: Rodney Craps, Operations Coordinator ([email protected], (803) 821‑5660).
Attached files
The award documents live at the source — open the contract source above to download them.