This contract concerns the complete replacement of water service infrastructure for the Brandywine Court Condominiums, including mobilization, traffic control, erosion control, surveying, installation of new 8‑inch and 6‑inch PVC water mains, gate valves, tapping sleeves, 2‑inch poly tubing, water meters, meter pits, fire hydrant removal and installation, and abandonment of existing mains. The solicitation was issued by the Delaware Bureau of Capital Construction as an Invitation to Bid with both regular and prevailing wage rates presented. Three firms submitted bids, but the award was made to Gateway Construction, Inc., a Delaware‑based contractor. The total evaluated cost for the awardee under the regular wage rate is $335,430, with an alternative prevailing‑wage total of $371,660. The work will be performed in Delaware and involves substantial civil‑construction activities related to water distribution.
• Scope: full water‑service replacement (pipe, valves, meters, hydrants, site work).
• Quantities: 580 LF of 8″ PVC, 210 LF of 6″ PVC, 12 EA of 2″ poly tubing, 12 EA of water meters, 3 EA fire hydrants, etc.
• Procurement: competitive Invitation to Bid (full and open competition) with unit‑price tables for regular and prevailing wage rates.