Description
This solicitation concerns the rehabilitation of the sanitary sewer system in the Burr Oak area, employing trenchless CIPP (Cured‑In‑Place Pipe) technology for 10‑in. and 15‑in. pipe diameters, along with associated lateral repairs, de‑watering, traffic control, and video inspections. The bid tabulation lists unit‑price line items for excavation, pipe installation, access cleanouts, and ancillary services, totaling roughly $400 k. The work is being procured by the City of Waukesha via an open bid process; however, no award decision is included in the provided excerpt.
• Primary scope: CIPP pipe lining (10‑in. & 15‑in.) and related lateral rehabilitation.
• Supporting services: excavation, de‑watering, traffic‑control signage, video inspection, and access cleanouts.
• Procurement method: Open competition with bids opened on May 8 2026; award status not disclosed.