Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Pennsylvania guidePennsylvania Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More energy and utilities bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Pennsylvania
  4. ›Closed bids
  5. ›Combined Heat and Power Expansion

Awarded contract·Pennsylvania State University-Main Campus·Pennsylvania

Combined Heat and Power Expansion

Won by McGough Construction Co., Inc.$35MAwarded 11/10/2017Single Award
Contract source

Awarded vendors

  • McGough Construction Co., Inc.

Description

The Pennsylvania State University awarded a design‑build contract with a Guaranteed Maximum Price (GMP) to McGough Construction Co., Inc. for the expansion of the West Campus Steam Plant to include a combined heat‑and‑power (CHP) system. The project replaces aging boiler equipment, adds a nominal 7 MW combustion turbine with waste‑heat recovery, and must remain fully operational throughout construction. The total project budget is approximately $35 million, with construction costs of about $26.7 million. The procurement process was competitive, involving a Letter of Interest, long‑list, RFP, short‑list, and interview stages before the Board of Trustees approved the award. • Scope: Design‑build of a 7 MW CHP unit, boiler replacement (Boiler 8), demolition of Boiler 6, integration of black‑start capability, and full plant operation continuity. • Delivery Method: Design‑Build with Guaranteed Maximum Price; pre‑construction services followed by GMP change‑order. • Budget: ~$35 M total (≈$26.7 M construction, $3.1 M design‑build fees, $2.8 M owner contingency). • Schedule: Awarded Nov 2017; construction start slated for Nov 2019; final completion expected Oct 2021. • Requirements: Mandatory 3‑D/BIM/VR modeling, emissions reduction ≥ 16,000 MT CO₂e, adherence to Pennsylvania Prevailing Wage Act, 15 % DBE participation, and continuous plant operation during construction.

Attached files

Key dates

Bids closed
4/2/2024
Intent to award
11/10/2017
Awarded
11/10/2017
Starts
11/10/2017
Ends
10/1/2021
Duration
4 years

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Energy and Utilities
NAICS
541330
Solicitation №
Project Number 00‑04966

Contract value

$35,000,000

The documents repeatedly reference a total project budget of $35 million (including $26.7 M construction, $3.1 M design‑build fees, $0.9 M owner soft costs, $2.8 M owner contingency, and $1.5 M escalation). Because the award was to a single design‑build firm under a GMP, the contract’s monetary value is effectively that total budget. No separate contract‑value figure is disclosed, so the best estimate is the $35 M budget stated in the Letter of Interest and Long‑List summaries.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

Muscatine Power and Water·Iowa

Top match · 63%

UNIT 10 COMBINED HEAT AND POWER PLANT CONTRACT 281 – BALANCE OF PLANT

Closes 10/27/2026Opened 9/1/2026

NYS OGS Design & Construction - Construction Contractors·New York

63% match

Provide Energy Efficient Upgrades

Closes 10/21/2026Opened 9/8/2026

U.S. Advanced Research Projects Agency Energy·United States of America

63% match

SEEDING CRITICAL ADVANCES FOR LEADING ENERGY TECHNOLOGIES WITH UNTAPPED POTENTIAL (SCALEUP) READY

Closes 9/29/2029Opened 10/2/2024

Power Authority of New York·New York

62% match

HVAC System Upgrade

Rolling / TBD closeOpened 6/10/2026

U.S. Department Of Energy·Ohio

62% match

TECHNOLOGY LICENSING OPPORTUNITY: Heat Pipe Reactor Wick and Fill Platform

Closes 12/3/2026Opened 6/4/2026

NYSERDA·New York

62% match

Clean Heat for All: Packaged Terminal Heat Pump Program - Phase II

Closes 6/30/2027Opened 10/10/2025

New York State Energy Research and Development Authority·New York

62% match

Window Heat Pump Demonstration Program - Phase I

Closes 6/30/2027Opened 11/14/2025

Muscatine Power and Water·Iowa

62% match

UNIT 10 COMBINED HEAT AND POWER PLANT CONTRACT 281 – BALANCE OF PLANT

Closes 10/27/2026Opened 9/1/2026

New York State Energy Research and Development Authority·New York

62% match

Window Heat Pump Demonstration Program - Phase II

Closes 6/30/2027Opened 11/14/2025

U.S. Department Of Defense·District of Columbia

62% match

RESEARCH AND DEVELOPMENT OF NAVAL POWER AND ENERGY SYSTEMS (N00024-19-R-4145 Broad Agency Announcement (BAA))

Closes 2/6/2028Opened 2/7/2023

City of Philadelphia·Pennsylvania

61% match

PW PQ Bid 6702 PHL 1675-15 Satellite Thermal Plant Chiller & Cooling Tower Upgrades - Electrical

Closes 10/22/2026Opened 10/5/2026

NYS OGS Design & Construction - Construction Contractors·New York

61% match

Provide Energy Efficient Upgrades

Closes 10/21/2026Opened 9/8/2026

NYS OGS Design & Construction - Construction Contractors·New York

61% match

47161 HVAC – Provide Energy Efficient Upgrades

Closes 10/21/2026Opened 9/8/2026

U.S. Department Of Defense·Pennsylvania

61% match

45--HEATER,SPACE,ELECTRIC

Closes 10/13/2026Opened 10/1/2026

Muscatine Power and Water·Iowa

61% match

UNIT 10 COMBINED HEAT AND POWER PLANT CONTRACT 281 – BALANCE OF PLANT

Closes 11/11/2027Opened 9/1/2026

City of Philadelphia·Pennsylvania

61% match

PW PQ Bid 6703 PHL 1675-16 Satellite Thermal Plant Chiller & Cooling Tower Upgrades - Mechanical

Closes 10/22/2026Opened 10/5/2026

National Aeronautics And Space Administration·Alabama

60% match

TECHNOLOGY TRANSFER OPPORTUNITY: Solid-State System Efficiently Generates Purified O2 (MSC-TOPS-148)

Closes 8/10/2027Opened 8/10/2026

The University of North Carolina·North Carolina

60% match

Frank Porter Graham Student Union - Solar Array Expansion

Closes 11/3/2026Opened 10/8/2026

NYSERDA·New York

60% match

Window Heat Pump Demonstration Program - Phase I

Closes 6/30/2027Opened 5/29/2026

Muscatine Power and Water·Iowa

60% match

UNIT 10 COMBINED HEAT AND POWER PLANT CONTRACT 281 – BALANCE OF PLANT

Closes 10/27/2026Opened 9/1/2026

New York State Energy Research and Development Authority·New York

60% match

New Efficient Homes New York: Heat Pump Incentive Program

Closes 12/14/2029Opened 9/25/2026

San Jacinto Community College District·Texas

60% match

CSP #27-01 Electrical Upgrades, Buildings C30, C31, C32

Closes 10/14/2026Opened 9/16/2026

Chesapeake Bay Bridge and Tunnel District·Virginia

60% match

IFB M-26-004 Replace Vent Building UPS

Closes 10/30/2026Opened 9/18/2026

U.S. Department Of Energy·Tennessee

60% match

Building Technologies Research and Integration Center: Technology Collaborations for US Building Technologies Industries

Closes 12/13/2028Opened 12/13/2023

City of Philadelphia·Pennsylvania

60% match

PW Prequalification Bid 6634 PHL 1675-14 Satellite Thermal Plant Chiller & Cooling Tower Upgrades

Closes 10/22/2026Opened 10/5/2026