Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Alaska guideAlaska Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More environmental services bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Alaska
  4. ›Closed bids
  5. ›Community Center Piping Abatement

Awarded contract·City and Borough of Wrangell·Alaska

Community Center Piping Abatement

$350kSingle Award
Contract source

Description

This contract concerns the removal and disposal of the original heating and plumbing piping system at the Wrangell Community Center, with two optional alternates involving asbestos‑containing insulation and boiler equipment removal. The scope includes mobilization, installation of temporary asbestos control barriers, abatement work, extensive air monitoring, disposal of hazardous materials per federal and state regulations, and demobilization. The work must be completed within a 30‑day period, limited to normal business hours, and includes liquidated‑damage provisions for delays. The City and Borough of Wrangell will award the contract on a firm‑fixed‑price basis after sealed‑bid submission. • Base Bid: Remove and dispose of all existing heating and plumbing piping. • Alternate 1: Asbestos‑containing insulation and refractory removal. • Alternate 2: Removal of boiler, hot‑water tank, and incinerator with recycling of steel. • Mandatory compliance with OSHA, EPA, and Alaska asbestos regulations, including a competent‑person, industrial‑hygienist, and certified asbestos workers on site.

Attached files

Key dates

Bids closed
5/8/2015

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Environmental Services
NAICS
562910

Contract value

$350,000

The bid package does not disclose a contract price. Based on comparable municipal pipe‑abatement projects of similar size (a community center with multiple zones, asbestos‑containing materials, and a 30‑day schedule), typical costs range from $200,000 to $500,000. Factors influencing the estimate include the need for specialized asbestos crews, disposal fees, equipment rentals (e.g., man‑lift), and the tight completion deadline with liquidated‑damage penalties. A median midpoint of $350,000 is a reasonable ballpark.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

Town of Flower Mound·Texas

Top match · 65%

Forest Vista AC Water Line Decommissioning

Closes 10/13/2026Opened 9/1/2026

Connecticut Town of Stratford·Connecticut

65% match

Diversion Chamber C Inlet Pipe Modifications -WPCF

Closes 10/16/2026Opened 9/17/2026

Town of Waterford·Connecticut

64% match

Community Center IT Room AC Replacement

Closes 10/13/2026Opened 9/10/2026

Connecticut Town of Stratford·Connecticut

63% match

Diversion Chamber C Inlet Pipe Modifications -WPCF

Closes 10/16/2026Opened 9/17/2026

Minnesota Department of Administration·Minnesota

62% match

Replace Sanitary Piping in Building #19 - MVH Minneapolis

Closes 10/15/2026Opened 9/3/2026

Massachusetts Town of Holliston·Massachusetts

61% match

Holliston WWTP Phase 1D - Yard Piping

Closes 10/30/2026Opened 10/6/2026

Minnesota Department of Natural Resources·Minnesota

61% match

Hinckley Area Office Rearing Ponds Water Supply

Closes 10/13/2026Opened 9/26/2026

Public Water Supply District No. 2 of St. Charles County·Missouri

61% match

WTP Pipe Gallery Replacement - St. Charles County, MO

Closes 11/18/2026Opened 10/1/2026

Anderson School District Five·South Carolina

61% match

Remove Pipe Insulation on Overhead Chilled Water Piping at Varennes Elementary

Closes 10/20/2026Opened 10/6/2026

Ysleta ISD·Texas

61% match

Abatement Services

Closes 2/28/2027Opened 1/12/2023

City of Fresno·California

61% match

Abatement of Lead Based Paint at 5223 W Ashlan Ave & Demolish and Dispose of Structures at 5245 & 5223 W Ashlan Ave, Fresno CA 93722

Closes 11/3/2026Opened 10/2/2026

Minnesota Department of Administration·Minnesota

61% match

Storm Sewer Lining/Sealing – Elgin, MN C-Store

Closes 10/23/2026Opened 9/30/2026

City of Portsmouth·Virginia

61% match

RFP#332-27-YE PIPE REHABILITATION SERVICES

Closes 10/19/2026Opened 9/8/2026

Village of Wellington·Florida

61% match

Water Reclamation Facility Solids Control Room Relocation Project.

Closes 10/29/2026Opened 9/29/2026

Town of Central·South Carolina

61% match

Town of Central Community Park Building Restoration Project

Closes 10/13/2026Opened 9/21/2026

Massachusetts Trial Court·Massachusetts

61% match

Chelsea DC - Chilled Water piping Taps

Closes 10/23/2026Opened 10/5/2026

City of Lakeland·Florida

60% match

McIntosh Power Plant Cooling Tower Distribution System Replacement

Closes 10/14/2026Opened 9/18/2026

City of Cincinnati·Ohio

60% match

Barrington Hills Pump Station Eliminations (10230090)

Closes 10/27/2026Opened 9/17/2026

City of Dunedin·Florida

60% match

Willow Wood Village Water Main Replacement

Closes 10/19/2026Opened 9/18/2026

University of Texas MD Anderson Cancer Center·Texas

60% match

Plumbing Services

Closes 10/13/2026Opened 9/14/2026

North Carolina City of Raleigh·North Carolina

60% match

Neuse River Resource Recovery Facility BNR Basins MCC Replacement

Closes 10/21/2026Opened 9/16/2026

Massachusetts Town of Chatham·Massachusetts

60% match

Cured-in-Place Pipe Lining

Closes 10/15/2026Opened 9/23/2026

Maryland Transit Administration·Maryland

60% match

Metro Charles Center Dewatering Discharge Pipe Replacement [Contract No. T-1561-0150]

Closes 10/23/2026Opened 8/28/2026

City of Charlotte·North Carolina

60% match

Lee Dukes Chemical Feed Piping Replacement

Rolling / TBD closeOpened 4/1/2026

U.S. Department Of Defense·Connecticut

60% match

Construction of Chilled Water Plant and Site Utility Upgrades at VA Medical Center in West Haven, CT

Closes 11/6/2026Opened 9/30/2026