This contract concerns the 2018 Sub‑Basin Remedial Measures project for the City of Fort Smith, Arkansas, encompassing a large‑scale sewer‑system rehabilitation. The Certified Bid Tabulation shows the city’s engineers’ cost estimate of $7.93 M versus the aggregated bid total of $7.60 M, indicating competitive pricing on a $7.6 M municipal infrastructure effort. The scope includes trenchless pipe rehabilitation (CIPP for 8‑18 in pipes), pipe‑bursting, new 24″ reinforced concrete pipe installation, extensive manhole construction/repair, trenching/back‑fill, traffic‑control, erosion control, and minor landscaping/ fencing tasks. Quantities are substantial (≈ 9,700 LF of CIPP, 2,400 LF of 24″ RCP, over 1,300 manhole‑related items). The document does not disclose awardees or contract dates, implying that the information is post‑award verification rather than a public award notice.
• Primary work: trenchless sewer pipe lining (CIPP) and pipe‑burst rehabilitation.
• Additional work: large‑diameter concrete pipe installation, manhole construction/repair, site preparation, traffic control, and landscaping.
• Total estimated contract value: roughly $7.6 M, with unit‑price line items across dozens of categories.