Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Arkansas guideArkansas Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Arkansas
  4. ›Closed bids
  5. ›17-10-C1ː SSA Remedial Measures, Basin 12, Phase I

Awarded contract·City of Fort Smith·Arkansas

17-10-C1ː SSA Remedial Measures, Basin 12, Phase I

$2.2MSingle Award
Contract source

Description

This bid tabulation documents the competitive bids received for the City of Fort Smith’s Phase 1 remedial‑measure construction program in Basin 12 of its storm‑water and sanitary‑sewer system. The scope encompasses extensive civil‑engineering work, including utility trenching, concrete curb and gutter installation, manhole construction and rehabilitation, pipe installation, surface restoration, traffic control, and related site work. The bid package contains over 70 line‑item categories, each priced on a unit‑price basis, culminating in an aggregate bid of approximately $2.2 million after a $100 k adjustment. The city’s ordinance provides a 5 % preference to a locally‑resident firm, indicating a potential small‑business or local‑firm advantage in the award evaluation. No award or contract execution details are included. • 71 line‑item categories covering trenching, concrete structures, manholes, pipe installation, surface repairs, and traffic utilities. • Total bid amount (after $100 k deduction) ≈ $2,199,925.30. • Bid opening/tablulation meeting held on 12 April 2023 at 10:00 A.M.

Attached files

Key dates

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Civil Engineering
NAICS
237110
Solicitation №
17-10-C1

Contract value

$2,199,925

The bid tabulation lists an overall total of $2,299,925.30 with a $100,000 deduction, resulting in a final adjusted total of $2,199,925.30. No other financial adjustments, retainage, or change‑order provisions are noted. Therefore, the contract’s estimated value is roughly $2.2 million USD. This estimate assumes the awarded contract will be for the full scope represented in the bid tabulation, with no significant scope reductions or additional work beyond what is listed.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

City of West Sacramento·California

Top match · 67%

Phase 1 Environmental Site Assessments for the West Sacramento Levee Improvement Program

Closes 10/26/2026Opened 9/28/2026

City of Columbia·South Carolina

66% match

SS7271 Sanitary Sewer Easement Maintenance Rebid

Closes 10/22/2026Opened 9/25/2026

City of Stillwater·Oklahoma

66% match

Stillwater Regional Water Treatment Plant Solid Contact Units Rehabilitation

Closes 11/11/2026Opened 10/10/2026

City of Rockford·Illinois

66% match

LEAD SERVICE LINE REPLACEMENT PHASE 11A

Closes 10/19/2026Opened 8/31/2026

Alaska Department of Environmental Conservation·Alaska

65% match

Aleutian Homes Phase VII Water and Sewer Determination of Categorical Exclusion

Rolling / TBD closeOpened 8/17/2026

Santa Clara Valley Water District·California

65% match

(Repost) On-Call Environmental Site Assessments/Hazardous Substance Liability Assessments (ESAS/HSLAS), Remediation, Storm Water Management And Engineering Services

Closes 10/26/2026Opened 9/29/2026

City of Rockford·Illinois

65% match

LEAD SERVICE LINE REPLACEMENT PHASE 11B

Closes 10/19/2026Opened 8/31/2026

U.S. Department Of Defense·Missouri

65% match

SB ERS MATOC, USACE Northwestern Division and EPA Region 2

Closes 11/16/2026Opened 7/30/2026

City of Salina·Kansas

65% match

ADDENDUM%20NO%201%2026017%202026%20Water%20Mains%20Replacement

Rolling / TBD closeOpened 7/31/2026

U.S. Department Of Defense·Missouri

65% match

ASARCO Taylor Springs Superfund Site Facility Area and Surrounding Custodial Trust Area

Closes 10/19/2026Opened 10/1/2026

City of Santa Rosa·California

65% match

Secondary Clarifier No 1 Rehabilitation Project

Closes 10/27/2026Opened 9/29/2026

City of Roseville·California

65% match

Construction Services: DCWWTP Primary Sedimentation Basin Rehabilitation Project

Closes 10/27/2026Opened 8/25/2026

City of Waco·Texas

65% match

Flat Creek Reuse Project Phase 1A

Closes 12/1/2026Opened 10/2/2026

Clemson University·South Carolina

64% match

Hwy 76 Remediation Project

Closes 10/22/2026Opened 9/30/2026

U.S. Department Of Defense·United States of America

64% match

Arcadia Wet Well Rehabilitation

Closes 10/26/2026Opened 10/8/2026

City of Salina·Kansas

64% match

ADDENDUM%20NO%201%2026017%202026%20Water%20Mains%20Replacement

Rolling / TBD closeOpened 7/31/2026

Southeastern Pennsylvania Transportation Authority·Pennsylvania

64% match

Request for Information – Sinkhole Remediation

Rolling / TBD closeOpened 5/13/2026

City of Santa Monica·California

64% match

Santa Monica Groundwater Basin Monitoring Program

Closes 10/26/2026Opened 9/28/2026

Alaska Department of Environmental Conservation – Village Safe Water Program·Alaska

64% match

Notice of Categorical Exclusion Determination - Marshall Phase 9 Water and Sewer Improvements

Rolling / TBD closeOpened 9/25/2026

U.S. Department Of Defense·Missouri

64% match

MSD Infrastructure Repairs Phase 2

Closes 6/23/2027Opened 6/23/2026

U.S. Department Of Defense·United States of America

64% match

SB ERS MATOC, USACE Northwestern Division and EPA Region 2

Closes 11/16/2026Opened 9/29/2026

Washington Commerce, Dept. of·Washington

64% match

Okanogan Soil Remediation Pilot Project

Closes 10/15/2026Opened 9/16/2026

County of San Luis Obispo·California

64% match

CSA 18 Salt and Nutrient Management Plan

Closes 10/26/2026Opened 10/5/2026

Texas City of Waco·Texas

64% match

Flat Creek Reuse Project Phase 1A

Closes 12/1/2026Opened 10/2/2026

Lowndes County·Georgia

64% match

TIA-15: Resufacing Phase I

Closes 11/12/2026Opened 10/7/2026