The Beaver Stadium Yearly Maintenance Project is a Penn State‑initiated effort to perform ongoing upkeep of the Beaver Stadium facilities. Bid Package 22.01 solicits a qualified design‑assist electrical partner to handle winterization and other electrical maintenance tasks. The project is complete in terms of selection, indicating an architect/engineer and design‑build partner has been appointed. This effort is not classified as a capital project (under $10 M) and is aimed at preserving stadium operations for future events.
• Scope includes electrical winterization, routine maintenance, and possible upgrades throughout Beaver Stadium.
• The solicitation seeks a design‑assist partner, implying collaborative engineering services rather than pure construction.
• Project status is “Complete – Architect/Engineer and Design/Build Selection,” meaning the award process has concluded and the vendor(s) are being prepared for work.
Attached files
The award documents live at the source — open the contract source above to download them.