The contract is for the removal of two PCMC owned 350kW Overhead Battery-Electric Bus Chargers. The contractor will be responsible for removing the chargers, including the docking control box, main charge equipment, power cabling, overhead charge assembly, and other related components. The project is expected to be completed by October 1, 2024. The contract includes provisions for payment, warranties, and termination. The contractor will be required to submit a proposal, which will be evaluated based on criteria such as qualifications, experience, and price.
• The contract includes a detailed scope of work, which outlines the specific tasks and responsibilities of the contractor.
• The contract also includes provisions for subcontracting and supplier reporting, as well as requirements for insurance and bonding.
• The contractor will be required to comply with all applicable laws and regulations, including those related to employment, safety, and environmental protection.
• The contract includes a provision for dispute resolution, which outlines the procedures for resolving any disputes that may arise during the project.