Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • Colorado guideColorado Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFQRFQ Meaning: What Is an RFQ?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Colorado
  4. ›PPSC DQ 27-005 Flooring Renovations RE-BID

Colorado Pikes Peak State College·Colorado

PPSC DQ 27-005 Flooring Renovations RE-BID

Closes 10/23/2026$40k – $80kRequest for Quotation
Get bids like this by emailBid source

Description

Pikes Peak State College is re‑issuing a solicitation for the complete flooring renovation of its Child Development Center. The scope includes removal of existing resilient flooring, preparation and leveling of the substrate, installation of new birch underlayment, commercial sheet‑vinyl flooring (Mannington Bio‑Spec MD or equivalent) with heat‑welded seams, rubber wall base, door transitions, adhesives, and all related accessories, plus delivery and on‑site supervision. Work must be performed safely, meet state and manufacturer standards, and be completed between early November 2026 and early March 2027. The contract will be awarded to the lowest responsive and responsible bidder whose quote is deemed most advantageous. • Mandatory site‑visit on Oct 20, 2026 (9 AM) at the Child Development Center, Colorado Springs, CO. • Quote submission deadline: Oct 23, 2026 by 2:00 PM MST via email to the procurement point of contact. • Contract period: Dec 7, 2026 – Mar 5, 2027 (≈3 months). • Required qualifications: experience in commercial flooring removal and installation, ability to supply all materials, labor, equipment, and waste disposal. • Evaluation based primarily on price, with secondary considerations for quality and lead time.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

James Gellenbeck(Director of Procurement and Contracts)

[email protected]

(719) 502-2008

Key dates

Opened
10/13/2026
Pre-bid meeting
10/20/2026Mandatory
Site visit
10/20/2026Mandatory
Closes
10/23/2026
Projected award
10/23/2026
Duration
3 months

Last updated

Details

Type
Request for Quotation
Industry
Construction
NAICS
238320
Solicitation №
DQ1-GJJA-2027000128-2

Budget estimate

$40,000 – $80,000

The solicitation does not disclose a contract ceiling. Based on typical commercial sheet‑vinyl installations (≈ 5,000 sq ft) at an estimated $8 – $12 per square foot (materials, labor, disposal, and supervision), the total contract value is likely in the $40,000 – $80,000 range. Larger square footage or premium materials could push the upper bound higher, while a smaller area or streamlined scope could lower it.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Michigan Genesee Intermediate School District·Michigan

Top match · 82%

EKLC Gym & GCI Concrete Floor Remodel

Closes 10/20/2026Opened 10/12/2026

New York City Department of Education·New York

82% match

Bid Extension: REQUIREMENTS CONTRACT FOR THE REPAIR AND REPLACEMENT OF WOOD FLOORS

Rolling / TBD closeOpened 5/25/2023

Riverside Unified School District·California

82% match

Bid No. 2026/27‑05 – Wood Floor Refinishing

Closes 10/20/2026Opened 9/23/2026

Sulphur Springs Union School District·California

82% match

Project No. DW 2026-09-22 Unit Bid Flooring District Wide

Closes 10/27/2026Opened 9/22/2026

Michigan Essexville-Hampton Public Schools·Michigan

82% match

Gymnasium Floor Replacement

Closes 10/23/2026Opened 10/8/2026

Southeast Kansas Education Service Center·Kansas

82% match

ESC-SPORTSFLOORING2027

Closes 11/4/2026Opened 9/28/2026

City of High Point·North Carolina

81% match

Bid 4005-102126 Paratransit Operations Facility LVT Flooring Replacement

Closes 10/21/2026Opened 9/23/2026

Michigan Genesee Intermediate School District·Michigan

81% match

EKLC Gym & GCI Concrete Floor Remodel

Closes 10/20/2026Opened 10/2/2026

Oregon Department of Corrections·Oregon

81% match

Two Rivers Correctional Institution Kitchen Floor Replacement

Closes 11/10/2026Opened 8/19/2026

Georgia Douglas County Board of Education·Georgia

81% match

DCSD27-010 Turner Middle School HVAC Modifications and Reroofing

Closes 11/9/2026Opened 10/9/2026

Michigan Detroit Public Schools Community District·Michigan

81% match

Pershing High School Bid Pack 2C- Signage and Final Cleaning

Closes 10/22/2026Opened 10/6/2026

Horry Georgetown Technical College·South Carolina

81% match

Asbestos Removal, Floor Repair and Carpet Replacement Conway Campus

Closes 10/27/2026Opened 10/2/2026

Fox Valley Technical College·Wisconsin

81% match

Flooring Replacement – AG137

Closes 10/23/2026Opened 10/6/2026

South Carolina Juvenile Justice·South Carolina

81% match

SCDJJ CAMP WHITE PINES - FLOORING

Closes 10/26/2026Opened 8/10/2026

Berkeley County School District·South Carolina

81% match

Terrazzo Flooring Repairs- District Wide

Closes 10/15/2026Opened 9/15/2026

Lee County Government of North Carolina·North Carolina

80% match

Gymnastics Facility Reroofing

Closes 11/3/2026Opened 9/29/2026

Riverside Unified School District·California

80% match

Wood Floor Refinishing – Riverside Unified School District

Closes 10/20/2026Opened 9/23/2026

Horry Georgetown Technical College·South Carolina

80% match

Remove Existing Carpet and Replace with Sheet Rubber Flooring

Closes 10/19/2026Opened 9/30/2026

Greenville County Schools·South Carolina

80% match

Concrete Installation - Blue Ridge High

Closes 10/15/2026Opened 9/29/2026

LAUSD·California

80% match

BEST VALUE - REQUEST FOR QUALIFICATIONS #2710048 - TOPANGA ELEMENTARY CHARTER SCHOOL

Closes 10/15/2026Opened 9/17/2026

California Department of Veterans Affairs·California

80% match

25HS0024 - NCVC Flooring Replacement Service

Closes 11/16/2026Opened 10/2/2026

University of Southern Mississippi·Mississippi

80% match

Joseph Anderson Cook Memorial Library Third‑Floor Carpeting

Closes 11/17/2026Opened 10/14/2026

Georgia Cobb County Board of Education·Georgia

80% match

Cooper Middle School Flooring & Auditorium Seating, B27060

Closes 11/5/2026Opened 10/6/2026

New York City Department of Education·New York

80% match

B4549 - Repair and Replacement of Wood Floors

Rolling / TBD closeOpened 9/17/2026

Georgia Douglas County Board of Education·Georgia

80% match

DCSD27-009 Dorsett Shoals Elementary School HVAC & Reroofing

Closes 11/9/2026Opened 10/9/2026