The City of Worcester is seeking a qualified contractor to replace the existing potable‑water booster‑pump skid at its Water Filtration Plant in Holden, MA. The scope includes complete removal of the existing skid, concrete pad repair, supply and installation of a factory‑built tri‑plex pump skid with associated pumps, motors, VFDs, valves, instrumentation, control panel, and SCADA integration, followed by testing, commissioning, training, and warranty documentation. The work must be performed while the plant remains operational, with any shutdowns limited to overnight windows and requiring prior approval. The contract must be completed by 30 Sept 2027, and the bid must be submitted in a sealed envelope by 25 Nov 2026.
• Remove and dispose of the existing booster‑pump skid and repair the concrete equipment pad.
• Supply, install, align, and commission a new prefabricated tri‑plex skid (pumps, motors, VFDs, control panel, instrumentation, SCADA).
• Conduct all required testing, start‑up, and provide two 4‑hour training sessions, operation manuals, warranties, and as‑built drawings.
• Comply with extensive MWBE, wage‑theft, prevailing‑wage, safety, noise‑restriction, and environmental requirements; submit weekly payroll and workforce reports; furnish 5 % bid security and 100 % performance/payment bonds.